My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-52 RESOLUTION Selecting the Construction Management at Risk Delivery Method for the Lee County Library 11-15-2021
public access
>
Clerk
>
RESOLUTIONS-PROCLAMATIONS
>
2021
>
2021-52 RESOLUTION Selecting the Construction Management at Risk Delivery Method for the Lee County Library 11-15-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:35:41 PM
Creation date
1/7/2022 3:35:40 PM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 Z t -�Z <br /> FILED <br /> LEE COUNTY NC <br /> PAMELA G. BRITT <br /> REGISTER OF DEEDS <br /> FILED Jan 05, 2022 <br /> AT 12:09:12 pm <br /> BOOK 00003 <br /> START PAGE 0791 <br /> END PAGE 0791 <br /> :.;J INSTRUMENT # 00108 <br /> EXCISE TAX (None) <br /> * o *; <br /> RESOLUTION SELECTING THE CONSTRUCTION MANAGEMENT AT RISK <br /> DELIVERY METHOD FOR THE LEE COUNTY LIBRARY <br /> WHEREAS, Lee County Board of Commissioners has approved the construction of a new <br /> Library to replace the existing Lee County Library located at 107 Hawkins Avenue, Sanford,NC <br /> 27330; and <br /> WHEREAS, Lee County has compared the advantages and disadvantages of using the <br /> Construction Management at Risk method for this project in lieu of the delivery methods <br /> identified in N.C.G.S. 143-128(a1)(1)through N.C.G.S. 143-128(al)(3); and <br /> WHEREAS, Construction Management at Risk provides an opportunity for involvement of the <br /> contractor during the design process for the purpose of providing the architect with feedback on <br /> constructability, real-time cost implications, scheduling, and other design issues; and <br /> WHEREAS, Construction Management at Risk requires the Construction Manager to use <br /> prequalified subcontractors; and, <br /> WHEREAS, Construction Management at Risk allows for transparency of the overall bidding <br /> and construction process, including the costs incurred by the Construction Manager; and <br /> WHEREAS, Lee County has concluded the Construction Management at Risk method is in the <br /> overall best interest of this project compared to the other delivery methods available in N.C.G.S. <br /> 143-128(al)(1)-(3). <br /> NOW THEREFORE, BE IT RESOLVED, that the Lee County Board of Commissioners selects <br /> the project above for the Construction Management at Risk construction delivery method in <br /> accordance with N.C.G.S. 143-128.1. <br /> Adopted this 115+h day of qe V8Ifl be( , Gt/Z I • <br /> /1/0 <br /> = , . Kirk D. Smith, Chair <br /> 4A , Lee County Board of Commissioners <br /> TTEST: �``�` <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.