Laserfiche WebLink
BOOK <br />20 <br />PAGE 91 <br />Capi <br />tal Improvements Prog <br />ram 2007-2011 <br />Projects < $500,000 <br />Sum <br />mary <br />.4414 <br />1. Inpnm Replace Roo/Shingle. <br />162,280 <br />62,260 <br />2. Etlwarda Replace ROOl Shinplm <br />)5,500 <br />Greenwootl Replace RCOl Shinplw <br />82,500 <br />d. Deep River HVAC Conbol System <br />IZ6,000 <br />25,000 <br />5. B <br />NVAC Conrol Sy.rem <br />rosoway <br />125,000 <br />22000 <br />hock H <br />6. Bullock HVAL Control System <br />125,000 <br />25,000 <br />1. Tramway HVAC Control System <br />125,000 <br />25,000 <br />Subtobl <br />661,180 <br />7 <br />7 <br />20,280 <br />I. Parkin, Lot Adduce <br />30,OW <br />00,000 <br />2. ESTCemer-Adddio..I Cost, <br />40,000 <br />W,WO <br />Civic Center Roof <br />4WO00 <br />00,00 <br />d. Civic Center Ronovationa <br />110,000 <br />90D0 <br />60, <br />60,000 <br />5. Truck Emrance <br />110,000 <br />0,000 <br />Subrogl <br />1,010,000 <br />390,00 <br />80, <br />0,000 <br />1. Byrd Optimist Park <br />350, <br />W,860 <br />Subtotal <br />]50, <br />0,860 <br />Re uesbd projects <$500,000 <br />EXCEM2 <br />1,020,000 <br />1,052,280 <br />4]0, <br />1,140 <br />HS Renovations(Feasibiley Study) <br />1OOWO <br />1000 <br />nm Replace RaolShln9lea <br />162,280 <br />162,280 <br />wards Replace ROOF Shingles <br />115,500 <br />114500 <br />enwood Replace ROOf Shingles <br />18;500 <br />182,500 <br />ep River HVAC Conbol System <br />125,000 <br />125,000 <br />oadway HVAC Contml System <br />125,000 <br />125,000 <br />llock HVAC Control System <br />125,000 <br />125,000 <br />mway HVA C Control System <br />8. <br />125000 <br />125000 <br />[ <br />Subtotal <br />35,000 <br />41;280 <br />115,500 <br />18ZWO $ <br />1,120,280 <br />tl Acquisition, Wagon Sr. <br />NOW <br />134000 <br />154,000 <br />ntl Acquisition, Wed. lc <br />10,00 <br />66000 <br />16,000 <br />ic Canter Root <br />400,000 <br />400000 <br />king Let A Eddien <br />JWOW <br />30,000 <br />T Center- Aristocrat Cwt, <br />ic Came, Renovation. <br />110,000 <br />90,000 <br />W00 <br />280,000 <br />ck Entrance <br />110,000 <br />10,000 <br />Subtobl <br />. <br />r <br />]0,000 <br />600,000 <br />110,000 <br />110,000 <br />90,000 <br />80,000 $ <br />1,320,000 <br />1. By rd Optimist Park <br />35,860 <br />350,860 <br />Subtotal <br />33,860 <br />M $ <br />350,860 <br />Recommended projects, < 550000 <br />30,000 <br />600,000 <br />160,000 <br />522,180 <br />616,360 <br />262,500 f <br />1,191,140 <br />f. LCHS Renovations(Feeabilty Study) <br />10,000 <br />10,000 <br />1. Inpnm Replaro RoolShinglm <br />162,280 <br />162,280 <br />J. Edwards Replace Roof Sbioglas <br />115,500 <br />115,500 <br />4. Greenwood Replace Rod Shingle <br />19$500 <br />182,500 <br />5. Deep River HVAC Conbol System <br />125,000 <br />125,000 <br />6. Broadwy HVA C Control System <br />122000 <br />125,000 <br />7. Mock HVAC Control System <br />125,000 <br />125,00 <br />8. Tramway HVAC Control System <br />125,000 <br />125,000 <br />Subtobl <br />' <br />350,00 <br />411,280 <br />115,500 <br />18ZWO S <br />1,120,280 <br />1. Land ACqugibon, Wagon SC <br />20,000 <br />14,190 <br />94,190 <br />1. Land Acqulation, Wagon Jr. <br />10,000 <br />2B,010 <br />3,010 <br />J. Civic Cengr Rod <br />40,000 <br />40,000 <br />4. Prism, Lot A tldnion <br />JOO,OW <br />300,000 <br />5. EST Comer-Atltldional Cwg <br />6. Civic Comer Renovatiom <br />110,000 <br />90,WO <br />80,OW <br />280,00 <br />1. Truck Ednmce <br />110,OW <br />I10,W0 <br />Subtobl <br />r <br />30,000 <br />502,200 <br />410,00 <br />110,00 <br />90,00 <br />80,000 $ <br />1,222,2W <br />1. Byrd Optimial Park <br />350,860 <br />350,860 <br />Subtotal <br />350,860 <br />- <br />f <br />35 <br />,860 <br />Adopted Pro'vda<$500,000 <br />3,000 <br />50,200 <br />160,00 <br />522,280 <br />616,360 <br />262,500 S <br />2,69,300 <br />Tobl Requesretl Prjecg $ <br />615,650 $ <br />48,691991 $ <br />6,518,445 $ <br />1121985] f <br />2381000 $ <br />181500 f <br />15610139 E <br />Total Recommended Projects $ <br />615,650 $ <br />]2,841,9/1 S <br />1,411,000 f <br />16,363,60 $ <br />616,360 E <br />26;30 S <br />53124021 $ 61500 <br />Total Adopted Projects S <br />615,650 $ <br />29,3]1,515 f <br />2,414100 f <br />16,36],600 $ <br />616,360 $ <br />262,500 $ <br />49619625 $ 17,491418 <br />