Laserfiche WebLink
BOOK 22 e~ct 992 <br />• 10. NEW SHOP BUILDING $458,150.00 <br />• Replace Roof <br />• Replace Doors, Frames and Hardware <br />• Interior Code Revisions <br />• Repair/Replace Flooring and Ceiling <br />• Repair Plumbing, Mechanical, and Electrical <br />• ACM Abatement (N/A) <br />11. ORIGINAL GYMNASIUM $895,400.00 <br />• Replace Doors, Frames and Hardware <br />• Interior Code Revisions <br />• Repair Plumbing, Mechanical, and Electrical <br />• Seal Building for Central Air Conditioning <br />• Install Central Air Conditioning <br />• ACM Abatement (N/A) <br />TOTAL CONSTRUCTION $7,316,870.00 <br />DESIGN and ENGENEERING FEES 7% 512,181.00 <br />• PROJECT CONTINGENCY 10% 731,687.00 <br />TOTAL STAGE 2 PROJECTED COST $8,560,738.00 <br />STAGE 3 CONSTRUCTION of NEW CLASSROOM BUILDING <br />Timeline and Cost Estimates (To Be Determined) <br />STAGE 4 RESTORATION of McLEOD AUDITORIUM <br />Timeline and Cost Estimates (To Be Determined) <br />E <br />