My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009 - 07-20-09 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2009
>
2009 - 07-20-09 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 2:46:15 PM
Creation date
8/20/2009 2:38:51 PM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 22 e~ct 992 <br />• 10. NEW SHOP BUILDING $458,150.00 <br />• Replace Roof <br />• Replace Doors, Frames and Hardware <br />• Interior Code Revisions <br />• Repair/Replace Flooring and Ceiling <br />• Repair Plumbing, Mechanical, and Electrical <br />• ACM Abatement (N/A) <br />11. ORIGINAL GYMNASIUM $895,400.00 <br />• Replace Doors, Frames and Hardware <br />• Interior Code Revisions <br />• Repair Plumbing, Mechanical, and Electrical <br />• Seal Building for Central Air Conditioning <br />• Install Central Air Conditioning <br />• ACM Abatement (N/A) <br />TOTAL CONSTRUCTION $7,316,870.00 <br />DESIGN and ENGENEERING FEES 7% 512,181.00 <br />• PROJECT CONTINGENCY 10% 731,687.00 <br />TOTAL STAGE 2 PROJECTED COST $8,560,738.00 <br />STAGE 3 CONSTRUCTION of NEW CLASSROOM BUILDING <br />Timeline and Cost Estimates (To Be Determined) <br />STAGE 4 RESTORATION of McLEOD AUDITORIUM <br />Timeline and Cost Estimates (To Be Determined) <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.