My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009 - 07-20-09 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2009
>
2009 - 07-20-09 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 2:46:15 PM
Creation date
8/20/2009 2:38:51 PM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 22 Pact 990 <br />• <br />Priority Order of Initial Improvements <br />Lee County High School <br />REVISED 09106108 <br />STAGE 1 WORK IN PROGRESS (Beginning November, 2008) <br />DEMOLITION and ANCIILLARY EQUIPMENT of BUILDINGS $271,300.00 <br />FUNDING APPROPRIATED by LEE COUNTY COMMISSIONERS 10120108 <br />• ACM Abatement for Foreign Language Building <br />• ACM Abatement for Art Annex Building <br />• Demolition of Foreign Language and Art Annex Buildings <br />• Furniture and Equipment <br />• Technology and Security <br />PURCHASE of TWO MODULAR PODS (26 Classrooms) $830,614.56 <br />FUNDING APPROPRIATED by LEE COUNTY COMMISSIONERS 12101108 <br />• <br />STAGE 2 PROPOSED PRIORITIES <br />1. INITIAL SITE WORK $900,000.00 <br />• Recondition storm drainage, catch basins and necessary improvements <br />• Relocate utilities and code required revisions <br />• Relocate walkways, steps and ramps <br />• Retrofit Technology grids as required <br />2. INSTALL NEW CENTRAL BOILER-CHILLER PLANT $965,000.00 <br />• A new power plant's technology will effectively mitigate the growth of mold in the HVAC <br />systems <br />• A central power plant would release electrical loads from existing services needed to <br />support new technology in renovated classrooms <br />• A central power plant should increase the energy efficiency of the entire campus <br />• A new central power plant is recommended as the most effective way to efficiently air <br />condition the Gymnasium <br />L <br />3. GYMNASIUM <br />• General Interior Revisions <br />• Replace Ancillary Acoustical Equipment <br />• Interior Code Revisions <br />• Replace Doors, Frames, and Hardware <br />• Repair Plumbing, Mechanical, and Electrical <br />• ACM Abatement <br />• Seal Building for Central Air Conditioning <br />• Install Central Air Conditioning <br />$1,203,400.00 <br />JUL 7 - 7/-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.