My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - Feb. 4, 2013 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2013
>
Minutes - Feb. 4, 2013 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2013 3:09:24 PM
Creation date
2/22/2013 3:08:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK:00025 PG <br />Work at the Contract Price, within the Contract Times, and in accordance with the <br />other terms and conditions of the Contract Documents. <br />G. Contractor is aware of the general nature of work to be performed by Owner and <br />others at the site that relates to the Work as indicated in the Contract Documents. <br />H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities or <br />discrepancies that Contractor has discovered in the Contract Documents and the <br />written resolution thereof by Engineer is acceptable to Contractor. <br />I. The Contract Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for performance and furnishing of the <br />Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520 -1 to 00520 -8) <br />2. Performance Bond (pages 00610 -1 to 00610 -3) <br />3. Payment Bond (pages 00615 -1 to 00615 -3) <br />4. Power of Attorney (page 00616 -1) <br />5. Certificate of Insurance (page 00618 -1) <br />6. General Conditions (pages 00700 -1 to 00700 -62) <br />7. Supplementary Conditions (pages 00800 -1 to 00800 -10) <br />8. Specifications as listed in the table of contents (pages 00010 -1 to 00010 -2) <br />of the Project Manual. <br />9. Drawings consisting of sheets numbered 1, 2, 9 and 10 and are not attached <br />to this Agreement, with each sheet bearing the following general title: Clyde <br />Rhyne Roadway Improvements. <br />10. Exhibits to this Agreement as follows: <br />a. Contractor's Bid (pages 1 to 9, inclusive); <br />b. Notice of Award (pages 00510 -1) <br />c. Documentation submitted by Contractor prior to Notice of Award. <br />11. The following that may be delivered or issued on or after the Effective Date <br />of the Agreement and are not attached hereto: <br />a. Notice to Proceed (pages 00550 -1) <br />b. Work Change Directives; <br />c. Change Order; <br />B. The documents listed in paragraph 9.01.A are attached to this Agreement (except <br />as expressly noted otherwise above). <br />C. There are no Contract Documents other than those listed above in this Article 9. <br />2793 -D: 01/10/2013 00520 -4 Agreement <br />Document in accordance with EJCDC No. C -520 (2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.