Laserfiche WebLink
I* <br />Ccc a <7 <br />eoc~ 9 r„F 8'76 ~ I~- I <br />I Ir ItI:!:1.1. 11,'.1[ I.LI%S. AK('I1I TECT I RO. BOX 670 1740 LEE A%'E\CF SANFOR D. SOY. TI I CAIMI-T`: 1 2 (919, <br />SUMMARY <br />ESTIMATE OF CONSTRUCTION COSTS <br />PHASE I LEE COUNTY-SHERIFFS DEPARTMENT <br />December 10, 1980 <br />Subcontracts & Materials <br />Carpet <br />$2,800 <br />Vinyl Asbestos Tile <br />500 <br />Ceramic Tile <br />3,000 <br />Acoustical Ceilings <br />2,700 <br />Insulation <br />2,300 <br />Mill Work <br />5,000 <br />Lockers <br />3,000 <br />Doors & Hardware <br />7,500 <br />Windows <br />5,600 <br />Security Bars <br />4,000 <br />Security Screens E Detention Eq. <br />12,000 <br />Plumbing Fixtures <br />3,600 <br />1 H.V.A.C. & Jail Ventilation System <br />20,000 <br />Electrical - New Service & Emer. <br />7,000 <br />Generator Installation <br />Light Fixtures, Switches, Outlets <br />2,000 <br />$81,000 <br />Misc. Construction Materials .17,400 <br />Labor 12.000 <br />A/E Fees <br />Preliminaries 2,600 <br />Working Drawings 6,000 <br />Inspection 3,000 <br />$122,000 <br />Denotes work to be awarded on basis of formal bids- <br />