My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - Jan. 7, 2013 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2013
>
Minutes - Jan. 7, 2013 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 10:51:24 AM
Creation date
1/29/2013 10:50:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 00025 PG <br />CONSTRUCTION MATERIALS TESTING SERVICES <br />COST ESTIMATE <br />Clyde Rhyne Drive (Paved Portion) <br />1051 -12 -113 <br />SANFORD, NORTH CAROLINA <br />I. Proofrolling Asphalt; Undercut Evaluation; Density Testing on Backfill (Assume 1 week of full -time) <br />a. Senior Soil Technician, Full -Time <br />5 days x <br />8 hrs/day x <br />$ 50.00 /per hour <br />$ 2,000.00 <br />b. Senior Soil Technician, Overtime <br />5 days x <br />2 hrs/day x <br />$ 75.00 /per hour <br />$ 750.00 <br />C. Senior Soil Technician, Part-Time <br />0 days x <br />6 hrs/day x <br />$ 50.00 /per hour <br />$ - <br />d. Mileage (per mile); <br />5 trips x <br />100 miles/trip <br />$ 0.55 /per mile <br />$ 275.00 <br />Estimated Fee: <br />Subtotal: <br />$ 3,025.00 <br />II. ABC Stone; Proofrolls / Density Testing of ABC Stone (No ABC Stone; Full -Depth Asphalt) <br />a. Senior Technician; Proofirolling, Stone Density; 0 trips x 6 hrs/trip x $ 50.00 /per hour $ <br />b. Mileage (per mile); 0 trips x 100 miles/trip $ 0.55 /per mile $ - <br />Subtotal: $ <br />III. Asphalt Coring (Assume 2 trips for asphalt coring) <br />a. Asphalt Coring 2 -man Crew; 2 trip x 6 hrs/trip x $ 150.00 /per hour $ 1,800.00 <br />b. Mileage (per mile); 2 trips x 100 miles/trip $ 0.55 /per mile $ 110.00 <br />Subtotal: $ 1,910.00 <br />IV. Professional Services (Review, Reports, Scheduling and Data Input) <br />a. Project Manager; <br />8 hrs x $ 90.00 /per hour <br />$ <br />720.00 <br />b. Senior Engineer; <br />1 hrs x $ 110.00 /per hour <br />$ <br />110.00 <br />C. Secretarial; <br />4 hrs x $ 45.00 /per hour <br />$ <br />180.00 <br />$35.00 /each <br />Subtotal: <br />$ <br />1,010.00 <br />V. Laboratory Testing <br />a. Standard Proctor for Soils <br />1 samples x <br />$185.00 /each <br />$ <br />185.00 <br />b. Compressive Strength of Concrete <br />0 samples x <br />$10.00 /each <br />$ <br />- <br />c. Specific Gravity of Cores (In -Place Asphalt) <br />9 samples x <br />$35.00 /each <br />$ <br />315.00 <br />Subtotal: <br />$ <br />500.00 <br />Estimated Fee: <br />$ <br />6,445.00 <br />ALL QUALITY ASSURANCE SERVICES: <br />$6,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.