My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - Jan. 7, 2013 Reg. Meeting
public access
>
Clerk
>
MINUTES
>
2013
>
Minutes - Jan. 7, 2013 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 10:51:24 AM
Creation date
1/29/2013 10:50:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B K 00025 PG: 0303 <br />Revised Change Order for CMT Services S &ME Project No. 1051 -12 -113 <br />Clyde Rhyne Drive — Lee County, North Carolina November 28 2012 <br />FEE <br />Our fee for testing services is based on the project plans provided on October 15, 2012 <br />and the 2012 North Carolina Standard Specifications for Roads and Structures. <br />Based on an anticipated construction schedule of 6 months, we have estimated a total fee <br />of $35,000 for the unpaved portion. For the paved portion, our estimated fee is $6,500. <br />Please note that the total testing fee is dependent on many factors, and is significantly <br />influenced by the actual construction schedule. If the actual construction schedule varies <br />from that assumed, the total fee for testing services will also vary. <br />AUTHORIZATION <br />We understand our services will be authorized under an amendment to the Standard Form <br />of Agreement between Engineer and Geotechnical Engineer for Professional Services <br />dated March 12, 2012. <br />This change order is solely intended for the Basic Services as described in the Scope of <br />Services. The Scope of Services may not be modified or amended, unless the changes are <br />first agreed to by the client and S &ME. Use of this change order and resulting documents, <br />including final report is limited to the above referenced project and client. No other use <br />is authorized by S &ME. <br />CLOSURE <br />We appreciate the opportunity to submit this change order and look forward to continue <br />working with you on this project. If you have any questions concerning information <br />presented herein, please contact us at your convenience. <br />Sincerely, <br />S &ME, Inc. <br />r <br />J. Adam Browning, P.E <br />Geotechnical Department Manager <br />John R. Browning, P.E. <br />Senior Engineer <br />Attachments: Fee Estimates <br />S:TROJECTS\2012\12 -113 Clyde Rhyne Drive\ GEOTECMFinancial \CO- 1\Revised\1051 -12 -113 CO-1 Revised Clyde Rhyne Drive (CMT).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.