Laserfiche WebLink
Bou 21 PAGE 96* <br />BUILDING PERMIT FEES <br />COMMERCIAL (continued) <br />COMMERCIAL <br />(New <br />Modular Units. <br />Building Permit Fee: <br />Estimated Cost of Construction shall be determined by multiplying the total gross building <br />square tiolage by the cost per square fool for Type of Occupancy listed below; <br />Permit Pist = Estimated Cost of Construction (from above) divided by $1,000, multiplied by 52 <br />r\ssem b I y <br />$80 <br />Business <br />$70 <br />6ducationel <br />$80 <br />Factorv/Industrial <br />$80 <br />Hazardous <br />580 j <br />Institutional <br />$100 <br />Mercantile <br />$80 <br />Residential <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />540 Heated <br />$35 Unheated <br />\,lised Occupancy <br />Highest Cost per Sy.Ft. of Occupancy Types <br />OTHER <br />COMMERCIAL <br />Includes all Commercial Renovations, Repairs, and Other Commercial <br />CONSTRUCTION <br />Construction not listed elsewhere. <br />Permit Pee is Calculated based on Applicants Estimated Cost of Construction. <br />Building Permit Pee: <br />(Bid, quote, or estimate must be provided with permit application). <br />Building permit fee shall be calculated by: $2.00 per $1,000 of Applicants Estimated <br />Cost of Construction. <br />Minimum Building Permit Pee is $40.00. <br />