My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008 - 01-07-08 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2008
>
2008
>
2008 - 01-07-08 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2009 3:59:20 PM
Creation date
1/15/2009 11:04:02 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 21 e'cE K9 <br />BUILDING PERMIT FEES <br />COMMERCIAL <br />COMMERCIAL <br />(New) <br />50,000 Square Feet and Less. <br />Building Permit Fee: <br />Estimated Cost of Construction shall be cetermined by multiplying the total gross building <br />square footage by the cost per square foot for Type of Occupancy listed below; <br />Permit Fee, = Estimated Cost of Consu uction from above divided by $1,000, multiplied b $2 <br />Assembly <br />$80 I <br />Business <br />$70 <br />Educational <br />$80 <br />Factor y/111dUStl Val <br />$80 <br />Hazardous <br />Institutional <br />$100 <br />Mercantile <br />S80 <br />Res i d en ti a I <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />$40 Heated <br />$35 Unheated <br />Mixed Occu pancv <br />Highest Cost per Sq.-t. Of Occupancy Types <br />COMMERCIAL <br />50,000 Square Feet and More. <br />(New) <br />fuilding Permit Fee: <br />Estimated Cost of Construction shall be determined by: <br />1. Nlultiplying the first 50,000 square feet of the total building gross square footage by <br />the cost per square foot for Type of Occupancy listed below. <br />2. Multiplying the square footage in excess of 50,000 square feet by the cost pet squire <br />foot for Type of Occupancy listed below and add to figure from above. <br />Permit Fee = Estimated Cost of Construction (from l above), divided by $1,000, <br />multiplied by $2 <br />Pitts <br />Estimated Cost of Construction (from 2 above), divided by $1,000, multiplied by $1. <br />Assembly <br />$80 <br />Business <br />$70 <br />Educational <br />$80 <br />Factory/ Industrial <br />$80 <br />Hazardous <br />$80 <br />Institutional <br />$100 <br />Mercantile <br />$80 <br />Residential <br />$80 <br />Storage <br />$40 Heated <br />$35 Unheated <br />Utility and Miscellaneous <br />$40 Heated <br />$35 Unheated <br />Mixed Occupancy <br />Hi hest Cost Per Sy.Ft. of Occupancy T es <br />
The URL can be used to link to this page
Your browser does not support the video tag.