Laserfiche WebLink
J M CA DA M S LEE21001 > PROPOSAL <br /> > Off-site road improvements and permitting shall be completed by others (WSP) under a separate contract. <br /> > Construction drawings will be developed based on the approved concept with revisions as noted in the graphic <br /> below: <br /> '1.Tw(2)relocated—twgk sk,... �. <br /> Mata. NGfMAY421 ' <br /> ivE nett. OUTPAW RE <br /> FOR FVnMO <br /> i1.Redure pedeatnen pMg OONMERMJL __K <br /> �.orgy W_.A r.rt pwltq <br /> _ rr.` t <br /> Fft*ft eo be¢ere o wRor' <br /> ",d.Carr.W*WMKV era- .4jy01 - 1 <br /> ysduce atx acq ecape `�, _ <br /> �d M�OIfTPWtC13 RES `, <br /> FOR FVitIRE '+ ♦t <br /> r r carrHEr�,a�usE <br /> .shum m eeRpll9 <br /> .p.R;p lot <br /> NOAOt <br /> .i.11.RYlt MIIDMUY _ O <br /> •wrw ..+. .... e O new <br /> r.��.'.+ ny.. • e '�7 <br /> wr. .�w� r wr.er....w..• I ry. G. ® rwaw.v <br /> rat..� a.ov�is.r� •....sa�.us <br /> Figure 1:Conceptual layout with owner directed changes <br /> PROPOSED SERVICES+ FEES <br /> We propose the following services (Alphanumeric task numbers are for internal coding purposes). <br /> The following fees are based on a total construction budget of$35,000,000+-. If the design team is directed to <br /> design to a higher budget, additional fees may apply. <br /> PROJECT MANAGEMENT AND MEETINGS <br /> FEE: $88,975 <br /> R8.01 Project Management: <br /> Scope includes project management tasks including scheduling meetings, creating meeting agendas, <br /> coordination between the design team and the County,coordination with subconsultants, and billing. <br /> creating experiences through experience 2 of 14 <br />