Laserfiche WebLink
CHANGE PROPOSAL FORM <br /> Project: Horton ParkBath House Proposal#: 2 <br /> Contract: Project#: <br /> Contractor: Manning Masonry Contractor#: JM Thompson <br /> Description of change: <br /> Demo and rebuild double brick wall per the plans on wall facing the pool entry. Point up all interior <br /> and exterior cracks per the rfi response. <br /> Materials (Attach list with Qty, Item, Unit$, Unit mh,Total mh, OT mh,Total$) SUBTOTALS <br /> 1 Total Direct Cost of Materials $1,058.52 <br /> 2 Overhead&Profit on Item 1. $158.78 <br /> (15% maximum) <br /> 3 Sales Tax $71.45 <br /> 4 Shipping&Transportation $0.00 $1.288.75 <br /> Labor <br /> 5 Total Manhours: 104.00 MH @ Ihr. $4,280.00 <br /> 6 Overhead &Profit on Item 5. $642.00 <br /> (15% maximum on straight labor cost) 0 <br /> 7 Payroll Taxes& Insurance 39.0% $1,669.20 $6,591.20 <br /> Equipment <br /> 8 Equipment(Scaffolding,mixer,saw) $995.00 Now <br /> 9 Overhead&Profit on Item 8. $199.00 $1,194.00 <br /> (20%maximum) <br /> Other <br /> 9 Other Costs $0.00 <br /> 10 Overhead&Profit on Item 9 $0.00 <br /> (10% maximum) <br /> Subcontractors (Include quotes with material&equipment backup) <br /> 11 Subcontractors $250.00 <br /> 12 Overhead& Profit on Item 10. $25.00 $275.00 <br /> (10% maximum) <br /> Subtotal of Proposal $9,348.95 <br /> 13 Bonds (%of subtotal of proposal) 0.00% $0.00 <br /> TOTAL OF CHANGE PROPOSAL $9,348.95 <br /> The Contractor agrees to perform the work outlined in this change proposal for the amount specified above and in accordance <br /> with the Contract documents if the work is authorized by the Owner. <br /> Contractor's Signature: Tim Manning Date: 12/27/2022 <br />