Laserfiche WebLink
_�J7gJ t IJ.M.THOMPSON <br /> 70 1 IJ GeneralContractorssince-1 PCCO #005 <br /> J.M.Thompson Project:21-1072-Horton Park Bath House <br /> PO Box 33066 1515 Washington Ave,Sanford,NC 27330 <br /> Raleigh,North Carolina 27636 Sanford, 27330 <br /> Phone:(919)851-611 Phone:919-7184605 <br /> Fax:(919)859-9583 <br /> Prime Contract Change Order #005: CE #005 - #7: Pool Side Exterior <br /> Double Brick Walls Between Door Openings 2 & 3. Point up of interior <br /> and exterior masonry walls. <br /> TO: Lee County Government FROM: J.M.Thompson <br /> 408 Summit Drive PO Box 33066 <br /> Sanford, 27330 Raleigh,North Carolina 27636 <br /> DATE CREATED: 12/28/2022 CREATED BY: Travis Thompson(J.M.Thompson) <br /> CONTRACT STATUS. Pending-In Review REVISION: 0 <br /> _v._... .... -- <br /> DESIGNATED REVIEWER: Mike Patton(Mcplll Associates) REVIEWED BY: <br /> DUE DATE: 01/06/2023 REVIEW DATE: <br /> INVOICED DATE: PAID DATE: <br /> SCHEDULE IMPACT: EXECUTED: No <br /> ---.----.____._..___ <br /> REVISED SUBSTANTIAL SIGNED CHANGE ORDER <br /> COMPLETION DATE: RECEIVED DATE: <br /> CONTRACT FOR: 1:Horton Park Bath House TOTAL AMOUNT. $9,816.40 <br /> DESCRIPTION: <br /> CE#005-#7:Pool Side Exterior Brick Between Storefront Ooeninos. Point uo of interior/exterior masonry walls, <br /> Rebuilding North exterior double brick walls between openings 2&3 because of existing instability of walls. Point up of interior and exterior masonry <br /> walls. <br /> ATTACHMENTS: <br /> COP2-wall rebuild brick(002).odf <br /> POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: <br /> PCO# I Title I Schedule Impact Amount <br /> 005 CE#005-#7:Pool Side Exterior Double Brick Walls Between Door I I $9,816.40 <br /> Openings 2&3.Point up of interior and exterior masonry walls. <br /> Total: $9,816.40 <br /> CHANGE ORDER LINE ITEMS: <br /> PCO#005:CE#005-#7:Pool Side Exterior Double Brick Walls Between Door Openings 2&3.Point up of interior and exterior masonry walls. <br /> # I Budget Code I Description I Amount <br /> 1 I04-050.SUB Lump Sum Masonry I Repair/Rebuild exterior double brick walls between door openings 2& I $9,348.95 <br /> 3.Point up interior&exterior masonry walls. <br /> Subtotal:I $9,348.95 <br /> Overhead(10.00%Applies to BURDEN,MATERIAL,EQUIPMENT OWNED,Misc Material,EQUIPMENT RENTED,OTHER,I S0.00 <br /> LABOR,OVERHEAD,and LABOR OVERTIME.): <br /> SUB WORK(5.00%Applies to SUBCONTRACT.): $467.45 <br /> Grand Total: $9,816.40 <br /> J.M.Thompson Page 1 of 2 Printed On: 12/28/2022 10.37 AM <br />