Laserfiche WebLink
uocubign tnmope iu:u iortAvoa-rktti.-4n a-oaoo-o�,cr�000 o o <br /> NX <br /> 434 Fayetteville Street <br /> Suite 1500 <br /> Raleigh,NC 27601 <br /> (919)836-4040 <br /> o Plan Sheets with Horizontal Design for all Alignments <br /> o Profile Sheets with Vertical Design for all alignments <br /> o Cross Sections <br /> o Preliminary Right of Way and easement limits <br /> o Proposed Guardrail Design if required. <br /> o Preliminary Slope Stake lines <br /> o Preliminary Earthwork Summary <br /> o Preliminary Construction Cost Estimate <br /> ➢ 75% Submittal <br /> o Approved 30%Plans <br /> o Incorporate approved drainage designs <br /> o Right-of-Way needs identified(if applicable) <br /> ➢ Final Submittal <br /> o Approved 90% Plans <br /> o Cross sections <br /> o Estimated Construction Quantities <br /> o Engineer's Construction Cost Estimate <br /> o Engineer's Construction Contract Documents <br /> Task 3—Roadway Design <br /> ➢ Design Assumptions Submittal <br /> o Design Assumptions <br /> ➢ Preliminary 90%Plan Submittal <br /> o Drainage Design <br /> ➢ Final Submittal <br /> o Drainage Summary Sheet&Quantities <br /> Task 4—Traffic Management <br /> ➢ Preliminary 60% Submittal <br /> o Staging Concept Traffic Control Phasing Notes <br /> ➢ 90% Submittal <br /> o Traffic Control Phasing Notes <br /> ➢ 100% Submittal(Final) <br /> o 100%Traffic Control Phasing Notes <br /> ➢ Final Submittal <br /> o Final Traffic Control Phasing Notes <br /> Task S—Pavement Marking and Signing <br /> ➢ 90% Submittal(Preliminary) <br /> o Preliminary Pavement Marking& Signing Plans <br /> ➢ 100% Submittal(Final) <br /> o 100%Final Pavement Marking& Signing Plans <br /> ➢ Final Submittal <br /> o RFC Final Pavement Marking& Signing Plans <br /> Task 6—Traffic Signal Design <br /> ➢ 90% Submittal <br /> o 90%Traffic Signal Design Plan <br /> ➢ 100% Submittal <br /> o 100%Traffic Signal Design Plan <br /> ➢ Final Submittal <br /> o Final Sealed Traffic Signal Design Plan <br /> "V <br />