My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-12-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
9-12-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 12:30:19 PM
Creation date
1/11/2023 12:20:15 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
9/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��11 MCADAMS LEE21001 > PROPOSAL <br /> > Off-site stormwater management facilities, revisions to the existing stormwater infrastructure or analysis of <br /> "downstream" stormwater system (will be quoted if required); <br /> > Wetlands permitting (will be quoted if required); <br /> > Environmental investigations, beyond those noted herein; <br /> > Flood studies for the City of Sanford or FEMA; <br /> > Subsurface Utility Location; <br /> > Permit application, plans review or re-review fees; <br /> > Acquisition of easements; preparation of off-site easements; <br /> > Court appearances for litigation, or preparation for same; <br /> > Legal advertisements for construction contracts; <br /> > Any costs incurred by Client or Contractor due to changes required by the approving authority or their <br /> inspectors after construction drawings have been approved; <br /> > Phase 1 site investigation and detailed Environmental assessments, studies, and analysis; <br /> > Hazardous materials surveying and abatement design; <br /> > City, County, and State Review and Permit fees; <br /> > Offsite improvements(roadway,water, sewer, or other utilities); <br /> > Physical models, other than those used by the design team to convey design ideas; <br /> > Significant redesign of project elements(redesign of parking layout, pedestrian access, utility routing, changes <br /> to the architectural floorplan, etc.) after acceptance of Schematic Design as requested by owner or as a result <br /> of design revisions by other design disciplines; <br /> > LEED registration or path to certification; and <br /> > Additional separate bid packages. <br /> GENERAL CONDITIONS <br /> > Client is responsible for all application and permit fees (as applicable). <br /> creating experiences through experience 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.