My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-12-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
9-12-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 12:30:19 PM
Creation date
1/11/2023 12:20:15 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
9/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iJ WADAMS LEE21001 > PROPOSAL <br /> > Furnishing Plan; <br /> > Code Required Landscape Plan; <br /> > Enhanced Landscape Plan; <br /> > Hardscape Plan; <br /> > Wayfinding/Signage Plan; <br /> > Site/landscape/hardscape Details; and <br /> > Project Manual to include technical specifications. <br /> E3.10 Construction Review Permitting: <br /> Prepare application forms and submit construction documents to the City of Sanford, NCDEQ, and NCDOT. <br /> Fee includes responses to two rounds of review comments and questions per permit submittal type <br /> (application fees by Client). <br /> G8.00 Trail Design: <br /> Review trail layout for feasibility and constructability. Provide details for trail material, width and <br /> specifications.Assumes no stream crossings or wetland impacts. <br /> D5.10 Constructability Review: <br /> Prior to finalizing plans prepare constructability review to check for the following <br /> > Clarity of notes and scope; <br /> > Availability of specified materials; <br /> > Grading/ADA; <br /> > Access and construction entrances/mobilization; and <br /> > Utility Conflicts. <br /> BID PHASE SERVICES <br /> FEE: $55,000 <br /> H5.40 Contractor Prequalification Assistance: <br /> Assistance with Contractor Pre-Qualification Process for Lee County Sports Complex. <br /> > Preparation of Contractor Pre-Qualification requirements package (RFQ); <br /> > Public advertisement of RFQ; <br /> > Receipt and distribution contractor responses to RFQ to of Developer selected panel for review; <br /> > Convening of Developer selected panel to review contractor responses to RFQ; <br /> > Publish results of Developer selected panel to all RFQ Respondents; and <br /> > Receive and Process any Contractor protests of non-Pre-Qualification. <br /> Note: All costs for bid advertisements will be directly invoiced as a direct reimbursable to the owner. <br /> creating experiences through experience 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.