My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-12-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
9-12-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 12:30:19 PM
Creation date
1/11/2023 12:20:15 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
9/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�111 WADAMS LEE21001 > PROPOSAL <br /> > Utility Plan; <br /> > Lighting Plan (By MEP); <br /> > Code Compliant Landscape Plan & Details; and <br /> > Building Elevations (By Architect). <br /> CONSTRUCTION DOCUMENTS (CDs) <br /> FEE: $252,700 <br /> Prepare 90%construction drawings and 100%bid drawings suitable for the public bidding process. This shall include <br /> a full plan set of all design development sheets as shown above, advanced to a 90%and 100% level of completion. <br /> 90%construction drawings will be used for final review by the Owner and to submit for the following permit <br /> approvals: <br /> > City of Sanford Construction Drawing Permits <br /> > NCDEQ—Erosion and Sediment Control <br /> > NCDOT—Encroachment Agreements <br /> Once approvals are secured,final 100%construction drawings will be issued as the bid set and for a final cost <br /> estimate used as a basis of comparison with received bids. <br /> D3.20 Civil Engineering-CDs: <br /> Prepare detailed plans for infrastructure Construction Drawings at 90%completion.The plan set shall <br /> include: <br /> > Demolition Plan; <br /> > Erosion and Sedimentation Control Plan; <br /> > Erosion and Sedimentation Control Details; <br /> > Grading and Drainage Plan; <br /> > Drainage Details; <br /> > Utility Plan; <br /> > Utility Details; and <br /> > Project Manual to include technical specifications. <br /> The final, approved Construction Permit Review set will serve as the 100%Construction Drawing project <br /> milestone. Approved plans will be released for bid. <br /> R8.70 Landscape and Hardscape Plans—CDs: <br /> Using the Design Development Plans, McAdams will prepare Landscape and Hardscape Construction <br /> Drawings to include the following sheets. <br /> > Cover Sheet; <br /> > Site Plan; <br /> creating experiences through experience 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.