My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-12-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
9-12-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 12:30:19 PM
Creation date
1/11/2023 12:20:15 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
9/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�JI WADAMS LEE21001 > PROPOSAL <br /> D3.10 Civil Engineering- DDs: <br /> Using the Schematic Design Plans, McAdams will prepare Infrastructure Design Development drawings to <br /> include the following sheets. <br /> > Demolition Plan; <br /> > Erosion and Sedimentation Control Plan; <br /> > Erosion and Sedimentation Control Details; <br /> > Grading and Drainage Plan; <br /> > Drainage Details; <br /> > Utility Plan; <br /> > Utility Details; and <br /> > Project Manual to include technical specifications. <br /> R8.65 Landscape Architecture—DDs: <br /> Using the Schematic Design Plans, McAdams will prepare Landscape and Hardscape Design Development <br /> drawings to include the following sheets. <br /> > Cover Sheet; <br /> > Site Plan; <br /> > Code Required Landscape Plan; <br /> > Enhanced Landscape Plan; <br /> > Hardscape Plan; <br /> > Wayfinding/Signage Plan; <br /> > Site/landscape/hardscape Details; and <br /> > Project Manual to include technical specifications. <br /> R8.75 Technical Review Committee Approval Process: <br /> Prepare submittal applications, respond to staff comments and attend meetings with City staff as <br /> necessary to attain the Technical Review Committee Review approval through the City of Sanford Planning <br /> Department. Fee assumes up to three rounds of review. Plan set will be developed using the TRC submittal <br /> checklist. <br /> Plan set to include the following: <br /> > Cover Sheet; <br /> > Existing Conditions & Demolition Plan; <br /> > Site Plan; <br /> > Furnishing Plan; <br /> > Erosion and Sediment Control Plan; <br /> > Grading Plan; <br /> creating experiences through experience 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.