Laserfiche WebLink
illll WADAMs LEE21001 > PROPOSAL <br /> Assumes an average of five hours per week for the duration of design schedule of 7 months. If the design <br /> schedule is extended for any reason, additional fees may apply. <br /> D3.70 Meeting Attendance-Civil: <br /> Attendance by the engineering project manager at one project kick-off meeting and up to 10 client <br /> meetings(3 on-site and 7 virtual).Client meetings to be held once every three weeks for the duration of <br /> the design process. <br /> R8.45 Meeting Attendance—Landscape Architecture: <br /> Attendance by the landscape architect principal and the landscape designer at one project kick-off <br /> meeting and up to 10 client meetings (3 on-site and 7 virtual). Client meetings to be held once every three <br /> weeks for the duration of the design process of 7 months. If the design schedule is extended for any <br /> reason, additional fees may apply. <br /> SCHEMATIC DESIGN (SD) <br /> FEE: $164,650 <br /> A1.11 Tree Survey: <br /> With Owner/Developer permission, a Tree Survey shall be conducted on the—121-acre parcel at Broadway <br /> Road and U.S. Highway 421 in Sanford, NC and include the following information in compliance with the <br /> City of Sanford's Site Planning review process: <br /> > Verification whether the existing vegetation meets or exceeds the perimeter buffer requirements. <br /> > Location of large and small trees within perimeter buffers. <br /> Deliverables: <br /> > Two (2)Site Visits;and <br /> > Tree Survey Report showing: <br /> o where appropriate,the GPS location and designation of trees (large or small) within <br /> the perimeter buffers to be counted towards buffer vegetation requirements. <br /> o where appropriate,typical buffer composition diagrams with tree inventory and <br /> associated photos displaying minimum buffer vegetation requirements. <br /> creating experiences through experience 3 of 14 <br />