My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 10-1-12 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2012
>
Agenda Package - 10-1-12 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 8:25:21 AM
Creation date
9/26/2012 8:20:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l! .J J <br />Mr. Derrell Mullins, AIA <br />September 6, 2012 <br />Page 2 <br />1254 <br />the exterior wall foundation to prevent future settlement; however, most settlement appears to have <br />already taken place. <br />5. A small area of roof deck along the southeast corner of the short side of the building has been <br />overlain with some form of insulation and an EPDM membrane roofing material, probably due to <br />the lack of drainage in this flat area. Another area of roof deck along the middle of the southwest <br />long side of the building has a significant deflection which ponds water and may result in future <br />leaks. There is no indication of a structural framing problem when the area is viewed on the inside <br />from the bottom of the deck. This area needs to be raised for proper drainage. See item 2 above. <br />6. The roofjoist girders, roofjoists and columns appear to be in good structural condition for continued <br />use. The roof deck, while in good condition, is not sloped properly for drainage and need to be <br />reworked as noted in items 2 and 5 above. <br />7. All of the roof penetrations need to be re- flashed. <br />8. The roof insulation is minimal and the exterior wall insulation is unknown. The original single pane <br />glass windows are still in place. <br />9. The building is currently unoccupied but would be used for office space. <br />130 Steele Street <br />1. This early structure is two -story, masonry exterior walls and masonry tenant/fire dividing walls with <br />a wood framed floor and roof. The wood floor framing was not visible and the following comments <br />will be limited to observations made at the second floor only. <br />2. Several holes in the ceiling plaster at the second floor revealed the wood roof framing. The original <br />plaster and wood lath ceiling remains in most of the building although large areas of ceiling <br />throughout have major water damage, with accompanying roof deck rot and roof framing damage, <br />the extent of which cannot be determined until the entire ceiling is removed. Then, repairs to the <br />roof framing can be made and areas of roof deck replacement can be identified for repair when the <br />built -up roofing is replaced. The great number of roof leaks is a certain indication that the roofing <br />needs to be replaced immediately. <br />3. The wood floors are generally level and in good condition in part of the second floor area but need <br />refinishing in the remaining areas. <br />4. There are several large cracks in the masonry tenant/fire dividing walls. These will need to be <br />repaired to maintain the wall fire rating. There does not appear to be a structural problem with the <br />cracked walls at this time. <br />5. An elevator would need to be constructed to meet current codes as well as a rear exit stair from the <br />second floor, both of which will involve structural, functional and property line considerations. The <br />existing front entry and stair will also need revisions. <br />6. In this buildinginsulation is almost non - existent. Even with the new windows that exist here, roof <br />and wall insulation will be a problem that will need addressing during renovations. <br />7. Failureof flashing of the masonry walls and wall cap flashing is causing leaks along the tenant walls <br />and may be contributing to the masonry cracking problem. <br />8. The first floor is currently occupied by commercial tenants. The second floor is currently <br />unoccupied but would be used for office space. <br />
The URL can be used to link to this page
Your browser does not support the video tag.