My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 10-1-12 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2012
>
Agenda Package - 10-1-12 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 8:25:21 AM
Creation date
9/26/2012 8:20:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
issues. The first is the roof has two active leaks, which can be repaired. The estimate of the cost to <br />repair is part of the attached reports. The Community College has offered to split this cost 50 -50 with <br />the County. In addition, due to age, the roof inspector felt the entire roof would need to be replaced in <br />the next 2 to 5 years. The estimate to do this is also attached. Secondly, the plaster ceilings cracked <br />under heat expansion when the A/C was cut off. On the first floor, the only issue found was extensive <br />mold due to a leaking sink in one of the un- occupied offices. This mold will need to be remediated <br />before occupancy. The estimated cost to remediate is attached. It is the belief of staff that Dr. Howard <br />should be responsible for this expense. <br />The County intends to move County Administration, Legal, Human Resources, GIS and Finance to the <br />408 Summit Drive location. The area that we vacate in the Government Center will be turned over to <br />the Health Department and DSS for badly needed space. The Health Department will probably move <br />WIC down to the area that HR occupies right now, freeing up valuable clinical space on the second floor <br />for the department. The Summit Building was inspected and two issues were uncovered. The <br />foundation of the building has settled causing the building to also settle. The roof needs to be reworked <br />to take this settling into account so that rain water will flow off the building. The cost to rework the roof <br />is in the attached report. This is a natural occurrence for a building of this age. Also due to the settling, <br />the front area of the building will need to be re- graded so that rain water will go away from the front <br />door. This work can be done by County staff. <br />The annual payments to Dr. Howard and his wife will be $151,458.36 a year. Currently, there are five <br />leases in the Steele Street property. Dr. Howard currently receives $40,000 per year for these leases. <br />The leases on Steele Street run for another two years. The loss in annual tax revenue to the County for <br />these two properties will be $3,837. The tax value of the two properties equals $511,620. By moving <br />GIS to the building, we eliminate $15,000 in rent payments annually to the City of Sanford. We will also <br />be relocating this department to a building that has adequate parking and is easy to access. Based on a <br />November 1, 2012 closing date, the operating costs for FY 2013 are estimated to be $108,807. Those <br />costs will be covered by the rental income from the Steele Street leases and the saving from the COPS <br />refunding that was completed in May 2012. <br />To move into the Building, the County will have to buy furniture and invest in some IT infrastructure. <br />There are 25 offices in the building, and we will occupy 19 with employees. We will also occupy 3 of the <br />rooms as conference rooms. There are several areas that we can use for storage and file cabinets. We <br />estimate the total cost of the move to be $75,563 - $48,000 for furniture and equipment, $15,000 for IT <br />infrastructure, $7,500 for legal fees, and $5,063 for roof repairs. Lisa and I are proposing to use part of <br />the savings from the COPS refunding, attorney funds in the FY 12 -13 budget and funds remaining in the <br />San Lee Dam Project to pay these one -time costs. <br />In the second year the savings from the COPS refunding and the rental income on the Steele Street <br />property will cover the annual operating costs. After year two, we will have to revisit the leases and <br />determine how they will impact the equation going forward. We also have the opportunity for <br />additional rental revenue from the small business incubator, but we do not want to count on that <br />revenue to justify the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.