My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORDINANCE - Lee County FY 2022-2023 Budget Ordinance 6-6-22
public access
>
Clerk
>
ORDINANCES
>
2022
>
ORDINANCE - Lee County FY 2022-2023 Budget Ordinance 6-6-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 11:59:50 AM
Creation date
6/8/2022 11:59:23 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Ordinance
Committee
Board of Commissioners
Date
6/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
forward four dollars ($9.00) of each fee collected to the Board of General Contractors, on a quarterly basis and the city <br /> may retain one dollar($1.00)of each fee collected. The Board shall deposit the fees received into the General Fund. <br /> ELECTRICAL PERMITS <br /> Electrical permits are required for"The installation,extension,alteration,or general repair of any electrical wiring, <br /> devices,appliances,or equipment." <br /> Electrical permits are issued to a North Carolina properly licensed North Carolina Electrical Contractor <br /> OR <br /> Property owners requesting to perform electrical work upon their own property when such property is not intended at the <br /> time for rent,lease,or sale will be required to take and pass an electrical exam prepared by this office. <br /> Permits will be issued personally to the license holder of record only. A bonafide employee of the licensee will be allowed <br /> to purchase permits upon submittal of the Authorization for Permit Application by Employee of Licensed Contractor <br /> Form. <br /> Temporary Service Poles <br /> Temporary Service Poles Inspections are to be made in conjunction with the footing or foundation inspection(permit fee is <br /> waived with new building construction only). In order to erect a temporary pole prior to or after the footing or <br /> foundation inspection or for renovations or additions, an electrical permit for the temporary pole must be obtained (see <br /> fee schedule). <br /> MECHANICAL PERMITS <br /> Mechanical permits are required for"The installation,extension,alteration or general repair of any heating or cooling <br /> system;" <br /> • Mechanical permits are issued to a properly licensed North Carolina Mechanical Contractor <br /> OR <br /> • To the owner of the building that occupies the building provided that the permit holder performs the work <br /> themselves(no rental property or commercial projects). <br /> NOTE: Mechanical change-outs and/or relocation of mechanical units require an electrical permit as described above. <br /> Permits will be issued personally to the license holder of record only. A bona fide employee of the licensee will be <br /> allowed to purchase permits upon submittal of the Authorization for Permit Application by Employee of Licensed <br /> Contractor Form. <br /> Grease Canopy Hoods do not require a licensed contractor. <br /> MANUFACTURED HOME PERMITS <br /> A licensed Dealer or Setup Contractor must obtain Manufactured Home Permits. The owner is allowed to obtain a <br /> manufactured home permit only if they are actually setting up the home themselves. <br /> L Inspections Forms/Fee Schedules 12021-2022 Fee Schedule <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.