My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORDINANCE - Lee County FY 2022-2023 Budget Ordinance 6-6-22
public access
>
Clerk
>
ORDINANCES
>
2022
>
ORDINANCE - Lee County FY 2022-2023 Budget Ordinance 6-6-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 11:59:50 AM
Creation date
6/8/2022 11:59:23 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Ordinance
Committee
Board of Commissioners
Date
6/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING PERMIT FEES <br /> COMMERCIAL (continued) <br /> **Phased Construction Permit: <br /> Permit Fee is Calculated based on Applicants Estimated Cost of Construction. <br /> Building Permit Fee: (Bid,quote,or estimate must be provided with permit application). <br /> Building permit fee shall be calculated by:$4.00 per$1,000 of Applicants Estimated <br /> Cost of Construction. <br /> Minimum Building Permit Fee is$60.00. <br /> **Phased Construction Permit: <br /> New commercial projects which involve multiple plan submittals by a contractor who has been hired to do <br /> a complete"Turn-key"project for the owner. <br /> OTHER <br /> COMMERCIAL Includes all Commercial Renovations,Repairs,Tenant Fit-ups,and Other <br /> CONSTRUCTION Commercial Construction not listed elsewhere. <br /> Permit Fee is Calculated based on Applicants Estimated Cost of Construction. <br /> Building Permit Fee: (Bid,quote,or estimate must be provided with permit application). <br /> Building permit fee shall be calculated by:$4.00 per$1,000 of Applicants Estimated <br /> Cost of Construction. <br /> Minimum Building Permit Fee is$60.00. <br /> COMMERCIAL Modular Units. <br /> (New) <br /> Building Permit Fee: Estimated Cost of Construction shall be determined by multiplying the total gross building <br /> square footage by the cost per square foot for Type of Occupancy listed below; <br /> Permit Fee=Estimated Cost of Construction(from above)divided by$1,000,multiplied by$4 <br /> Assembly $100 <br /> Business $85 <br /> Educational $100 <br /> Factory/Industrial $100 <br /> Hazardous $100 <br /> Institutional $120 <br /> Mercantile $100 <br /> Residential $100 <br /> Storage $50 Heated <br /> $45 Unheated <br /> Utility and Miscellaneous $50 Heated <br /> $45 Unheated <br /> Mixed Occupancy Highest Cost per Sq.Ft.of Occupancy Types <br /> L Inspections Fonns/Fee Schedules\2021.2022 Fee Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.