My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-4-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
4-4-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 5:04:25 PM
Creation date
6/2/2022 5:03:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
garden loops on the existing cross country trail that need to be signed for <br /> separation from the cross country trail & also evaluated for difficulty. If we do B) <br /> & D), there will be no charge to move the old trail from the Pidaparthi & Harrington <br /> Properties because when we build the new trail, we can make the old trail <br /> connections disappear. Build new trail to keep trail users off of the Laughlin <br /> property, the Herman & Spivey properties, the Bosher & Watson properties & the <br /> Campbell property. $15,000.00 This will take a lot of time to get machinery out to <br /> all the small separate sites and build new trail & cut out sight lines for old trail & <br /> make it disappear. We will also remove trail connections between the hiking trail <br /> that crosses the mountain bike trail in <br /> Yes - G) - A complete Signage Plan & Map will be developed such that both the <br /> maps & the on site user experience will be consistent, enjoyable and as risk free as <br /> possible. $2,250.00 <br /> Yes - H) - A complete maintenance plan can be developed with detailed <br /> instructions & tasks for monthly maintenance work. $750.00 <br /> No - I) - I recommend an assessment of the lower Gravity Park Gathering Area to <br /> redesign it for less risk & a more straightforward & consistent rider experience. <br /> The upper gathering area could also use design help to enhance the riders <br /> experience in preparing to ride down the gravity trails. <br /> ** The above tasks will also include a full & complete listing of all bridges &/ or <br /> wooden structures on the trail system as well as a risk assessment & structural <br /> evaluation of each of them too. <br /> ** Let me know what tasks listed above you are interested in B.R.T.W., Inc. <br /> completing & I can get pricing back to Lee County. <br /> ** See the attached map for a conceptual trail design of A), B), C), D), & part of <br /> E). <br /> QUOTATION : <br /> Work Chosen - <br /> B) - $22,500.00 <br /> C) - $17,000.00 <br /> Proposal and Agreement Page 3 of 3 <br /> Owner Date_/ / Contractor Date / / <br />
The URL can be used to link to this page
Your browser does not support the video tag.