My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-4-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
4-4-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 5:04:25 PM
Creation date
6/2/2022 5:03:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services - <br /> San-Lee Park Trail Proposal <br /> No - A) - Build new trail connector (3' or 6' wide) from lower parking lot along road <br /> uphill to the beginning of existing intermediate cross country trail. <br /> Yes - B) - Build a new beginner mtb trail loop (4' wide) with two entrances & <br /> exits. One from the lower parking lot & one from the mtb parking lot. - <br /> $22,500.00 The trail design has not been done yet & may require the <br /> construction of a new bridge or two depending on the design & the state of the <br /> current bridges in that area. I can let you know specifics on this within a week of <br /> getting a go ahead on this. <br /> Yes - C) - Build new hiking trail (3' wide) (C1) from lower parking lot across the <br /> existing hike bridge near the playground & into the woods below the pump track, <br /> then cross the road to the mtb parking lot & then new trail (C2) between the <br /> camping area and the lake until the wooden steps are reached above the existing <br /> "hiking" bridge. - If B) & D) are done, then part of the hiking trail will have to go <br /> away and that will mean that (C1) will need to be built to have a connected loop on <br /> the hiking trail, while (C2) is optional. (C1) - $8,000.00 & (C2) - $9,000.00 if <br /> done with (C1) & $10,500.00 if done later <br /> Yes - D) - Build a new two way connector trail (6' wide) from the MTB parking lot <br /> to the lower gathering area of the gravity park. Requires a new bridge over the <br /> creek below the gravity park gathering area. $10,750.00 for trail & 6' wide x <br /> 24' long wood Bridge with handrails. Add $3,950.00 to build a 3' wide by <br /> 24' long wood Bridge with handrails to replace the existing hiking bridge <br /> next to the new mountain bike bridge. The current wood step/bridge that <br /> is taking hikers over the rocks near the current hiking bridge over the <br /> creek, needs to be removed as it is rotten & in poor structural shape. We <br /> will remove at no charge if it is done with the hiking bridge & we can price <br /> a replacement after we see everything opened up. It should be a <br /> maximum of around $5,000.00, maybe less. Any Bridges we build come <br /> with a limited 10 Warranty. See below <br /> No - E) - Rebuild hiking trail around both lakes. This area also needs new bridges & <br /> fishing decks to replace old ones. On the South side, a new hiking trail could be <br /> built below the existing MTB Trail in order to close the hiking trail that is currently <br /> mixed in with the existing MTB trail. <br /> Yes - F) - Move existing mtb trail from non park property in 6 different places. <br /> This means we will build new trail to keep trail users on Lee County Park property & <br /> off of private property. We will make the old trail "disappear" where the new trail <br /> connects with the existing usable trail, but we will not make all the old & now <br /> unused trail that is on private property go away. That would cost more. We will <br /> need the property lines flagged in these areas. There are also three separate rock <br /> Proposal and Agreement Page 2 of 3 <br /> Owner Date_/_/ Contractor Date /____/_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.