My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2-21-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
2-21-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 4:06:26 PM
Creation date
4/18/2022 4:03:53 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
2/21/2022
Book No
33
Page No
850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF ARTICLES <br /> 1 INITIAL INFORMATION <br /> 2 ARCHITECT'S RESPONSIBILITIES <br /> 3 SCOPE OF ARCHITECT'S BASIC SERVICES <br /> 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> 5 OWNER'S RESPONSIBILITIES <br /> 6 COST OF THE WORK <br /> 7 COPYRIGHTS AND LICENSES <br /> 8 CLAIMS AND DISPUTES <br /> 9 TERMINATION OR SUSPENSION <br /> 10 MISCELLANEOUS PROVISIONS <br /> 11 COMPENSATION <br /> 12 SPECIAL TERMS AND CONDITIONS <br /> 13 SCOPE OF THE AGREEMENT <br /> ARTICLE 1 INITIAL INFORMATION <br /> § 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br /> (For each item in this section, insert the information or a statement such as "not applicable"or "unknown at time of <br /> execution.') <br /> § 1.1.1 The Owner's program for the Project: <br /> (Insert the Owner's program, identify documentation that establishes the Owner's program, or state the manner in which <br /> the program will be developed.) <br /> § 1.1.2 The Project's physical characteristics: <br /> Lee County Design Architect of Record for this project to provide professional programming/planning,design,and construction <br /> administration services for the County Library.The new library is expected to be designed as a 30,000 SF new building.The final <br /> building size will be concluded at the completion of the Programming.The Scope of Services(Basic and Supplemental Services)is <br /> outlined in Section 3.The new Library will be delivered through a Construction Management-at-Risk(CMAR)delivery method using <br /> SAMET/Sanford Contractors. <br /> § 1.1.3 The Owner's budget for the Cost of the Work,as defined in Section 6.1: <br /> Total Budget is$16,000,000 <br /> § 1.1.4 The Owner's anticipated design and construction milestone dates: <br /> .1 Design phase milestone dates,if any: <br /> a. Programming and Planning. 21 February— 11 April 2022 <br /> b. Programming and Planning Report Submittal Complete. 11 April 2022 <br /> Init. AIA Document 8133- -2019.Copyright©2014,and 2019 by The American Institute of Architects.All rights reserved.The'American Institute of Architects," <br /> "AIA,`the AIA Logo.and`AIA Contract Documents'are registered trademarks and may not be used without permission.This document was produced by AIA .2 <br /> software at 09:18:54 ET on 02/11/2022 under Order No.2998476739 which expires on 09/25/2022,is not for resale,is licensed for one-time use only,and may only <br /> be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (1664241209) <br />
The URL can be used to link to this page
Your browser does not support the video tag.