MEM <br /> .1 :-AIA Document B133 - 2019 <br /> Standard Form of Agreement Between Owner and Architect, Construction Manager as <br /> Constructor Edition <br /> AGREEMENT made as of the 10th day of February in the year 2022 <br /> (In words, indicate day, month and year.) ADDITIONS AND DELETIONS: <br /> The author of this document has <br /> BETWEEN the Architect's client identified as the Owner: added information needed for its <br /> (Name, legal status, address, and other information) completion.The author may also <br /> have revised the text of the original <br /> Lee County Government AIA standard form.An Additions and <br /> 408 Summit Drive Deletions Report that notes added <br /> Sanford,NC 27331-1988 information as well as revisions to the <br /> standard form text is available from <br /> the author and should be reviewed.A <br /> and the Architect: vertical line in the left margin of this <br /> (Name, legal status, address, and other information) document indicates where the author <br /> has added necessary information <br /> and where the author has added to or <br /> Vines Architecture,Inc. deleted from the original AIA text. <br /> 819 W.Hargett St., Suite 102 <br /> Raleigh,NC 27603 This document has important legal <br /> (919)755-1975 consequences.Consultation with an <br /> attorney is encouraged with respect <br /> for the following Project: to its completion or modification. <br /> (Name, location, and detailed description) This document is intended to be used <br /> in conjunction with AIA Documents <br /> Lee County Library 4841-01-21 <br /> Sanford,NC 27330 A201-2017TM',General Conditions of <br /> the Contract for Construction; <br /> A133-2019TM' Standard Form of <br /> The Construction Manager(if known): Agreement Between Owner and <br /> (Name, legal status, address, and other information) Construction Manager as <br /> SAMET Corporation and Sanford Contractors Constructor where the basis of <br /> 5430 Wade Park Blvd, Suite 110 payment is the Cost of the Work Plus <br /> Raleigh,NC 27607 a Fee with a Guaranteed Maximum <br /> 919-703-0263 Price;and A134-2019""Standard <br /> Form of Agreement Between Owner <br /> The Owner and Architect agree as follows. and Construction Manager as <br /> Constructor where the basis of <br /> payment is the Cost of the Work Plus <br /> a Fee without a Guaranteed <br /> Maximum Price.AIA Document <br /> A201 m1-2017 is adopted in this <br /> document by reference.Do not use <br /> with other general conditions unless <br /> this document is modified. <br /> Init. AIA Document 8133- -2019.Copyright©2014,and 2019 by The American Institute of Architects.All rights reserved.The`American Institute of Architects," <br /> AIA."the AIA Logo,and"AIA Contract Documents'are registered trademarks and may not be used without permission.This document was produced by AIA <br /> software at 09:18:54 ET on 02/11/2022 under Order No.2998476739 which expires on 09/25/2022,is not for resale,is licensed for one-time use only,and may only <br /> be used in accordance with the AIA Contract Documents€Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (1664241209) <br />