My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2-21-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
2-21-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 4:06:26 PM
Creation date
4/18/2022 4:03:53 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
2/21/2022
Book No
33
Page No
850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.3.6 The Architect shall submit the Schematic Design Documents to the Owner and the Construction Manager. The <br /> Architect shall meet with the Construction Manager to review the Schematic Design Documents. <br /> § 3.3.7 Upon receipt of the Construction Manager's review comments and cost estimate at the conclusion of the <br /> Schematic Design Phase,the Architect shall take action as required under Section 6.4, and request the Owner's approval <br /> of the Schematic Design Documents.If revisions to the Schematic Design Documents are required to comply with the <br /> Owner's budget for the Cost of the Work at the conclusion of the Schematic Design Phase,the Architect shall incorporate <br /> the required revisions in the Design Development Phase for add'!services.. <br /> § 3.3.8 In the further development of the Drawings and Specifications during this and subsequent phases of design,the <br /> Architect shall be entitled to rely on the accuracy of the estimates of the Cost of the Work,which are to be provided by the <br /> Construction Manager under the Construction Manager's agreement with the Owner. <br /> § 3.4 Design Development Phase Services <br /> § 3.4.1 Based on the Owner's approval of the Schematic Design Documents,and on the Owner's authorization of any <br /> adjustments in the Project requirements and the budget for the Cost of the Work,the Architect shall prepare Design <br /> Development Documents for the Construction Manager's review and the Owner's approval.The Design Development <br /> Documents shall be based upon information provided,and estimates prepared by,the Construction Manager and shall <br /> illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and <br /> other documents including plans,sections,elevations,typical construction details, and diagrammatic layouts of building <br /> systems to fix and describe the size and character of the Project as to architectural,structural,mechanical and electrical <br /> systems,and other appropriate elements.The Design Development Documents shall also include outline specifications <br /> that identify major materials and systems and establish in general their quality levels. <br /> § 3.4.2 Prior to the conclusion of the Design Development Phase,the Architect shall submit the Design Development <br /> Documents to the Owner and the Construction Manager. The Architect shall meet with the Construction Manager to <br /> review the Design Development Documents. <br /> § 3.4.3 Upon receipt of the Construction Manager's information and estimate at the conclusion of the Design <br /> Development Phase,the Architect shall take action as required under Sections 6.5 and 6.6 and request the Owner's <br /> approval of the Design Development Documents. <br /> § 3.5 Construction Documents Phase Services <br /> § 3.5.1 Based on the Owner's approval of the Design Development Documents,and on the Owner's authorization of any <br /> adjustments in the Project requirements and the budget for the Cost of the Work,the Architect shall prepare Construction <br /> Documents for the Construction Manager's review and the Owner's approval. The Construction Documents shall <br /> illustrate and describe the further development of the approved Design Development Documents and shall consist of <br /> Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and <br /> other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the <br /> Work,the Construction Manager will provide additional information, including Shop Drawings, Product Data, Samples <br /> and other similar submittals,which the Architect shall review in accordance with Section 3.6.4. <br /> § 3.5.2 The Architect shall incorporate the design requirements of governmental authorities having jurisdiction over the <br /> Project into the Construction Documents. <br /> § 3.5.3 During the development of the Construction Documents,if requested by the Owner,the Architect shall assist the <br /> Owner and Construction Manager in the development and preparation of(l)the Conditions of the Contract for <br /> Construction(General,Supplementary and other Conditions)and(2)a project manual that includes the Conditions of the <br /> Contract for Construction and Specifications, and may include sample forms. <br /> § 3.5.4 Prior to the conclusion of the Construction Documents Phase,the Architect shall submit the Construction <br /> Documents to the Owner and the Construction Manager. The Architect shall meet with the Construction Manager to <br /> review the Construction Documents. <br /> Init. AIA Document 8133` -2019.Copyright©2014,and 2019 by The American Institute of Architects.All rights reserved.The"American Institute of Architects," <br /> "AIA,"the AIA Logo.and`AIA Contract Documents"are registered trademarks and may not be used without permission.This document was produced by AIA 9 <br /> software at 09:18:54 ET on 02/11/2022 under Order No.2998476739 which expires on 09/25/2022,is not for resale,is licensed for one-time use only,and may only <br /> be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (1664241209) <br />
The URL can be used to link to this page
Your browser does not support the video tag.