My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2-21-22 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2022
>
2-21-22 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 4:06:26 PM
Creation date
4/18/2022 4:03:53 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
2/21/2022
Book No
33
Page No
850
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dr.John C. Crumpton. <br /> Lee County Manager <br /> 408 Summit Dr. Sanford.NC 27330 <br /> 919-718-4605—Ext. 5508 <br /> j crumpton(a,l eecountync.gov <br /> § 1.1.9 The persons or entities,in addition to the Owner's representative,who are required to review the Architect's <br /> submittals to the Owner are as follows: <br /> (List name, address, and other contact information.) <br /> Santiago Giraldo <br /> Lee County Development Services Director <br /> 408 Summit Dr. Sanford.NC,27330 <br /> Richard Oldham <br /> Sanford Contractors <br /> PO Box 9. Lemon Springs,NC 28355 <br /> § 1.1.10 The Owner shall retain the following consultants and contractors: <br /> (List name, legal status, address, and other contact information.) <br /> .1 Construction Manager: <br /> SAMET Corporation and Sanford Contractors. <br /> Richard Oldham <br /> Sanford Contractors <br /> 5430 Wade Park Blvd,Suite 110 <br /> Raleigh,NC 27607 <br /> 919-703-0263 <br /> (The Construction Manager is identified on the cover page.If a Construction Manager has not been <br /> retained as of the date of this Agreement,state the anticipated date of retention. If the Architect is to assist <br /> the Owner in selecting the Construction Manager, complete Section 4.1.1.1) <br /> .2 Land Surveyor: <br /> .3 Geotechnical Engineer: <br /> .4 Civil Engineer: <br /> .5 Other consultants and contractors: <br /> (List any other consultants and contractors retained by the Owner.) <br /> § 1.1.11 The Architect identifies the following representative in accordance with Section 2.4: <br /> (List name, address, and other contact information.) <br /> Victor Vines—Principal-in-Charge <br /> Robert Thomas—Design Principal <br /> Jeff Schroeder—Project Architect <br /> Dave Hardin—Project Architect <br /> § 1.1.12 The Architect shall retain the consultants identified in Sections 1.1.12.1 and 1.1.12.2: <br /> Init. AIA Document 8133- -2019.Copyright©2014,and 2019 by The American Institute of Architects.All rights reserved.The`American Institute of Architects," <br /> "AIA.°the AIA Logo.and"AIA Contract Documents are registered trademarks and may not be used without permission.This document was produced by AIA 4 <br /> software at 09:18:54 ET on 02/11/2022 under Order No.2998476739 which expires on 09/25/2022,is not for resale,is licensed for one-time use only,and may only <br /> be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (1664241209) <br />
The URL can be used to link to this page
Your browser does not support the video tag.