c. Schematic Design Phase Complete. 15 July 2022 <br /> d. Design Development Phase Complete. 18 November 2022 <br /> e. Construction Documents Phase Complete. 7 July 2023 <br /> f. Estimated Approved and Release for Bid. 10 July 2023 <br /> g. GMP Recommendation to Award. 15 September 2023 <br /> h. Notice to Proceed(construction). 29 September 2023 <br /> i. Estimated Construction Period. 2 October 2023—31 October 2024 <br /> j. Lee County Acceptance of Building. 1 November 2024 <br /> k. FFE Installation. 1 November— 13 December 2024 <br /> 1. Owner Move-n Period. 1-31 December 2024 <br /> .2 Construction commencement date: <br /> a. Estimated Construction Period. 2 October 2023—31 October 2024 <br /> .3 Substantial Completion date or dates: <br /> a. Lee County Acceptance of Building. 1 November 2024 <br /> .4 Other milestone dates: <br /> a. See 1.1.4.1 <br /> § 1.1.5 The Owner intends to retain a Construction Manager pursuant to the following agreement: <br /> (Indicate agreement type.) <br /> [X] Lee County's Standard Form Agreement between Owner and Construction Manager in accordance with <br /> Lee County resolution for CMAR from 15 NOV 2021 <br /> [ ] AIA Document A 133-2019, Standard Form of Agreement Between Owner and Construction Manager <br /> as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed <br /> Maximum Price. <br /> [ ] AIA Document A134-2019, Standard Form of Agreement Between Owner and Construction Manager <br /> as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed <br /> Maximum Price. <br /> § 1.1.6 The Owner's requirements for accelerated or fast-track design and construction,or phased construction are set <br /> forth below: <br /> (List number and type of bid/procurement packages.) <br /> § 1.1.7 The Owner's anticipated Sustainable Objective for the Project: <br /> (Identify and describe the Owner's Sustainable Objective for the Project, if any.) <br /> § 1.1.7.1 If the Owner identifies a Sustainable Objective, the Owner and Architect shall complete and incorporate AIA <br /> Document E234TM-2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, into this <br /> Agreement to define the terms,conditions and services related to the Owner's Sustainable Objective. If E234-2019 is <br /> incorporated into this Agreement,the Owner and Architect shall incorporate the completed E234-2019 into the <br /> agreements with the consultants and contractors performing services or Work in any way associated with the Sustainable <br /> Objective. <br /> § 1.1.8 The Owner identifies the following representative in accordance with Section 5.4: <br /> (List name, address, and other contact information.) <br /> Init. AIA Document 8133- -2019.Copyright©2014,and 2019 by The American Institute of Architects.All rights reserved.The"American Institute of Architects," <br /> AIA,'the AIA Logo.and'AIA Contract Documents'are registered trademarks and may not be used without permission.This document was produced by AIA 3 <br /> software at 09:18:54 ET on 02/11/2022 under Order No.2998476739 which expires on 09/25/2022,is not for resale,is licensed for one-time use only,and may only <br /> be used in accordance with the AIA Contract Documentse Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (1664241209) <br />