My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8-16-21 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2021
>
8-16-21 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 10:13:59 AM
Creation date
9/24/2021 10:13:35 AM
Metadata
Fields
Template:
Admin-Clerk
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Manager's Report — August 16, 2021 <br /> Ongoing Projects <br /> Courthouse & Government Center Renovations — Work continues in the Main <br /> Courthouse Building. The renovations of the Clerk of Court office are complete. We are <br /> now waiting on furniture and storefront pieces. Renovations have moved to the old <br /> Register of Deeds, District Attorneys and Magistrate Courtroom areas. Work at the <br /> courthouse should be completed before the holidays. Work at the Government Center is <br /> still ongoing. Phase 1 & 2 anticipated completion date is September 6. Phase 3 will start <br /> immediately after completion of the first two phases. The smoke stack demolition should <br /> begin anytime. We expect completion of this entire project in the first quarter of next year <br /> (2022). <br /> Historic Courthouse Grant — The Federal Government has issued the clearances so <br /> these funds can be released to grant recipients. Once we receive and approve the grant <br /> packages we can begin the process of design, bidding and construction of exterior <br /> renovations. No timetable as to when this process will start. The process up to now has <br /> moved very slowly. <br /> Board of Elections —The recent damage to the building due to the surprise thunderstorm <br /> has pushed completion of this project back to the end of August. Most of the damage <br /> has been repaired and replacement furniture and equipment is being purchased with <br /> insurance claim money from our contractor. Furniture should be arriving any day. <br /> Security system install is beginning. We expect the Elections to move into the space in <br /> late August or early September. <br /> Parking Lot Projects — Fred Smith, Inc. was awarded the parking lot projects for the <br /> Courthouse, Board of Education, and Douglas Drive during the last Commissioners <br /> meeting. Both parties have signed all contracts. Construction will begin in late August. <br /> Weather permitting, these projects should be completed by the first of November. Bar <br /> Construction is the low bid for the renovations of the Hillcrest Parking lot. This award is <br /> on the agenda for the Commissioners meeting. This project will start in September. There <br /> could be traffic issues along Hillcrest when the contractor constructs the new pedestrian <br /> walkway from the Parking lot to the building. This should only be for a short time. <br /> Parks and Recreation Projects - Bob Hales Center — Most of the work inside the <br /> building is complete. The contractor has run into supply issues. The material needed to <br /> complete the work on the outside where the roll-up doors was delayed but is now on site <br /> and is being installed. Completion date is July 31, 2021. Horton Pool Design — design <br /> for the upgrades to the Horton Pool continue. The recommended design will include a <br /> walk in area that will have splash pad features. Kid pools are being phased out from <br /> parks due to health and safety issues. Therefore, a larger walk-in area is proposed for <br /> the children at Horton Park and the kiddy pool will be removed. A further update on the <br /> Pool design will be presented to the Commissioners at the September meeting. <br />