My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-19-21 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2021
>
5-19-21 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 3:39:18 PM
Creation date
7/13/2021 3:38:34 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
5/19/2021
Book No
32
Page No
784
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII.EProject 48378117-01- 21 Horton Park Community Pool and Splashpad Agreement <br /> for Engineering Services with McGill and Associates <br /> Development Services Director Santiago Giraldo requested approval of a <br /> professional engineering services proposal from McGill Associates and the ability <br /> to finalize a contract once reviewed by legal. The contracted services includes <br /> evaluation of the current swimming pool, pool systems, and pool house, design of <br /> a project to refurbish the existing pool house structures as well as the construction <br /> of a new swimming pool and children zero entry pool/playground combination. The <br /> total amount of the services to be provided by McGill and Associates is $129,200. <br /> Lee County Horton Pool Agreement 13MAY2021.pdf <br /> Motion: Motion to approve proposal from McGill Associated and authorize <br /> Chair to sign contract once reviewed by the Legal Department. <br /> Mover: Robert Reives <br /> For: 7 - Arianna Lavallee, Dr. Andre Knecht, Robert Reives, Cameron Sharpe, <br /> Kirk Smith, Bill Carver, Mark Lovick <br /> Motion Result: Passed <br /> VII.FProject 4839- 01-21 Lee County Multi Sports Complex Survey RFP approval <br /> Development Services Director Santiago Girlado with the assistance of Finance <br /> conducted a proposal opening on May 5, 2021 at 2 p.m. Nine proposals were <br /> received including McAdams, Froehling and Robertson, SWC Environmental, <br /> Wooten Company, McGill Associates, Timmons Group, Withers and Ravenel, <br /> Kimley Horn, and Stewart. Staff recommended to award the RFP 4839-01-21 Lee <br /> County Multi Sports Complex Survey to McAdams Company. Mr. Giraldo stated <br /> that the amount of the contract will not exceed $110,000, and the timeline for the <br /> survey is no more than 45 days from the day of notice to proceed. <br /> Signed Tabulation Sheet RFP 4839-01-21.pdf <br /> Motion: Motion to approve proposal to conduct Phase 1 survey to be <br /> completed by McAdams Company and to authorize the Chair to sign the <br /> contract once it is reviewed by the legal department. <br /> Mover: Mark Lovick <br /> For: 7 - Arianna Lavallee, Dr. Andre Knecht, Robert Reives, Cameron Sharpe, <br /> Kirk Smith, Bill Carver, Mark Lovick <br /> Motion Result: Passed <br /> VII.GProposed Legislation <br /> Commissioner Knecht stated he is proposing that a draft of the legislation is sent <br /> to legislative representatives. The proposed legislation would limit annexation to <br /> industrial purposes only outside of the 3 mile limit that currently authorizes <br /> annexation outside of the city limits. Commissioner Knecht requested to move the <br /> proposed legislation to the next agenda to allow the members of the Board to <br /> consider the proposal. <br /> Proposed Legislation 2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.