My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-19-21 BOC Budget Work Session
public access
>
Clerk
>
MINUTES
>
2021
>
5-19-21 BOC Budget Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 3:28:01 PM
Creation date
7/13/2021 3:28:01 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
5/19/2021
Book No
32
Page No
781
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perspective. Bharat Forge and Audentes have requested to move their projects out a year <br /> due to COVID related delays. Bob Joyce, Senior Director for Business Retention and <br /> Expansion, provided a brief update on projects in progress. He stated that Bharat Forge is <br /> producing parts and equipment has been installed, but the gas line was difficult to install <br /> under the railroad track so they've been operating off of tanks of propane. They hope, in the <br /> next two weeks, to have permanent gas service and will be closer to receiving their <br /> certificate of occupancy, and so far they've been operating with a temporary certificate of <br /> occupancy. Audentes Therapeutics which will become Astellas, uses mobile modules in their <br /> production process and are about 50 - 60% complete. The modules have precertification <br /> from the FDA which shortens the process to get to production. Assistant County <br /> Manager/Finance Director Lisa Minter provided an update on existing incentive agreements <br /> and performance with investment and jobs. <br /> Tax - 4:30 p.m. <br /> Tax Administrator Michael Brown presented an overview of the budget requests for the Tax <br /> Department. The tax office is made up of the appraisal, listing, and collections departments. <br /> The tax department's responsibility to the county is to tax property in the county fairly and <br /> equitably. The billing cycle will begin in July. Budget changes include reclassifications to help <br /> train and make the office stronger with training and succession planning. Changes in the <br /> budget in the appraisal section includes maintenance technology for the annual increase <br /> from Tyler Technologies. For contracted services an RFQ will be sent out and they are <br /> looking for a vendor to assist in the industrial and commercial properties as they move <br /> forward with the next reappraisal process. The department is also looking to acquire a 4 <br /> wheel drive or all wheel drive vehicle to assist in site visits. The department has also worked <br /> to develop a program with foreclosures and currently has money available that could be <br /> used to offset other areas until the program becomes more active. The tax collection rate for <br /> real property is about 99% so most of the tax collection methods are working well. <br /> General Services/Solid Waste - 5:00 p.m. <br /> General Services Director Russell Spivey presented a budget overview for the General <br /> Services Department. Mr. Spivey stated that his goal is to make sure facilities are safe, <br /> environmentally friendly for employees and the public, and that he has adequate staff to take <br /> care of grounds. The General Services Department has three divisions. There is a request <br /> for additional positions in the grounds division due to loss of availability of inmates to provide <br /> assistance. In order to use inmates, all staff would need to be vaccinated. This year due to <br /> adding additional buildings the department has requested to increase staff to maintain the <br /> buildings. Housekeeping has also faced challenges due to COVID. Spivey stated that <br /> positions for General Services have not been requested over 20 years. The biggest budget <br /> line item increase is because of building improvements which this year include the Daymark <br /> roof and Health Clinic roof. The department is also trying to upgrade fire alarm systems at <br /> Douglas Drive and Daymark to commercial grade systems. The courthouse panel needs to <br /> be upgraded since it is currently the original panel that was installed when the building was <br /> constructed. Also, at the courthouse the chillers are over 15 years old so the department is <br /> requesting for an engineering firm to analyze the chillers for future replacement. There is <br /> also a need to address parking lots at some buildings to seal and restripe to extend lifetime <br /> of the pavement. The requested budget also includes an increase in building maintenance <br /> due to the two buildings that have been added on. The recommended budget prioritizes the <br /> submitted requests. Adult probation roof will begin work in June. The worst roof right now is <br />
The URL can be used to link to this page
Your browser does not support the video tag.