Laserfiche WebLink
SUPPLEMENTAL CONDITIONS FOR SURVEY, ENVIRONMENTAL OR GEOTECHNICAL SERVICES <br /> E Supplemental Condition is incorporated herein when the applicable box is checked. <br /> ❑ S.1 Location of Underground Utilities longer than thirty(30)days after submission of the final <br /> It shall be the Client's responsibility to locate and report unless agreed otherwise. <br /> physically mark all underground utilities and structures S.3.2 Hazardous or Potentially Hazardous <br /> which lie within the work area prior to the start of Samples and Materials <br /> subsurface investigations. If the Client elects not to In the event that samples and/or materials contain or <br /> assume this responsibility, Client shall notify are suspected to contain substances or constituents <br /> Consultant and shall compensate Consultant for all hazardous or detrimental to health, safety, or the <br /> costs associated with locating and physically marking environment as defined by federal, state, or local <br /> said underground utilities and structures over and statutes, regulations, or ordinances, Consultant will, <br /> above the estimated project fee. Client shall indemnify after completion of testing, return such samples and <br /> and hold Consultant harmless from any damages and materials to Client,or have the samples and materials <br /> delays resulting from unmarked or improperly marked disposed of in accordance with Client's directions and <br /> underground utilities and structures. For reasons of all applicable laws. Client agrees to pay all costs <br /> safety, Consultant will not begin work until this has associated with the storage, transportation, and <br /> been accomplished. disposal of samples and materials. Client recognizes <br /> and agrees that Consultant at no time assumes title to <br /> II S.2 Subsurface Investigations said samples and materials, and shall have no <br /> In soils, foundation, groundwater, and other responsibility as a handler, generator, operator, <br /> subsurface investigations, the actual characteristics transporter,or disposer of said samples and materials. <br /> might vary significantly between successive test points S.3.3 Contaminated Equipment <br /> and sample intervals and at locations other than where All laboratory and field equipment contaminated in <br /> observations, exploration, and investigations have Consultant's performance of services will be cleaned at <br /> been made. Because of the inherent uncertainties in Client's expense. Contaminated consumables will be <br /> subsurface evaluations, changed or unanticipated disposed of and replaced at Client's expense. <br /> underground conditions may occur that could affect Equipment (including tools) which cannot be <br /> Project cost and/or execution. These conditions and reasonably decontaminated shall become the property <br /> cost/execution effects are not the responsibility of the and responsibility of Client. At Client's expense, such <br /> Consultant. equipment shall be delivered to Client, or disposed of <br /> in the same manner specified in S.3.2 above. Client <br /> [1 S.3 Disposition of Samples and Equipment agrees to pay Consultant the fair market value of any <br /> S.3.1 Disposition of Samples such equipment which cannot reasonably be <br /> No samples and/or materials will be kept by Consultant decontaminated and is delivered to Client pursuant to <br /> this Agreement. <br /> Lee Co Parks R Rec Consulting Agmen <br /> February 2021 <br />