My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-2020 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2020
>
12-21-2020 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:31:47 AM
Creation date
2/22/2021 11:31:44 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
12/21/2020
Book No
32
Page No
325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Agreement Between ASJ Wilson Construction and Lee County Government <br /> THIS AGREEMENT ("Agreement"), made the 21st day of December, 2020 by and between <br /> ASJ Wilson Construction (hereinafter referred to as the "Contractor") and Lee County <br /> Government (hereinafter referred to as the "Owner") agree as follows: <br /> 1. Scope of Work: The Contractor shall furnish and deliver all of the materials, and perform <br /> all of the work in the manner and form as provided by the enumerated plans, <br /> specifications and documents, which are attached hereto and made a part thereof as if <br /> fully contained herein: advertisement, Instructions to Bidders, General Conditions with <br /> Exhibit A, Supplementary General Conditions, specifications, accepted proposals, <br /> contract, performance bond, payment bond, power of attorney, worker's compensation, <br /> public liability, insurance certificates any and all addendums, and all plans and drawings. <br /> 2. The Contractor shall commence work to be performed under this agreement on a date to <br /> be specified in a written order of the Owner("Notice to Proceed") and shall fully <br /> complete all work hereunder within one hundred and twenty calendar days from said date <br /> of Notice to Proceed. For each day in excess thereof, liquidated damages shall be <br /> assessed in the amount of one thousand dollars (S 1,000) per day. The Contractor, as one <br /> of the considerations for the awarding of this contract, shall furnish to the Owner a <br /> construction schedule setting forth the project broken down by various divisions of the <br /> work and by the calendar days, as described in the General Conditions. <br /> 3. The Owner agrees to pay to the Contractor for the faithful performance of this agreement, <br /> subject to additions and deductions as provided in the specifications or proposal, in <br /> lawful money the amount of two hundred and forty-three thousand dollars ($243,000.00). <br /> 4. Alternates. Alternates, if any, included in the Contract Sum are as follows: <br /> Item Price <br /> N/A N/A <br /> 5. Allowances. Allowances, if any, included in the Contract Sum are as follows: <br /> Item Price <br /> N/A N/A <br /> 6. Unit Prices. Unit prices, if any, are as follows: <br /> Item Price per Unit <br /> Sawcutting existing conc. Slab $30.00 SY <br /> 4" Tk. Replacement floor Slab $8.00 SY <br />
The URL can be used to link to this page
Your browser does not support the video tag.