My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-2020 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2020
>
12-21-2020 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:31:47 AM
Creation date
2/22/2021 11:31:44 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
12/21/2020
Book No
32
Page No
325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the change. All other items of cost shall be considered as overhead and covered by the <br /> percentages allowed in sections A and B of this paragraph. <br /> The Contractor shall provide worksheets or tabulations describing the method by which the <br /> direct net cost was calculated, and shall provide all data needed to support the calculation of the <br /> direct net cost, all in a form acceptable to the Owner. <br /> 13.5 Where the Contract Price is to be adjusted by negotiation, the Owner may authorize and <br /> designate the Designer to negotiate with the Contractor on behalf of the Owner; provided, <br /> however, any agreement reached between the Contractor and Designer shall be subject to <br /> approval by the Owner <br /> ARTICLE 14. UNFORESEEN CONDITIONS <br /> 14.1 Should the Contractor encounter unforeseen conditions at the Project site materially <br /> differing from those shown on the Drawings or indicated in the Specifications or differing <br /> materially from those ordinarily encountered and generally recognized as inherent in work of <br /> the character provided for in this Agreement, the Contractor shall immediately, and in no <br /> event more than three days later, give notice to the Owner of such conditions before they are <br /> disturbed. The Owner and the Designer shall thereupon promptly investigate the conditions <br /> and if they find that they materially differ from those shown on the Drawings or indicated in <br /> the Specifications, they shall at once make such changes in the Drawings and/or <br /> Specifications as they may find necessary. Any increase or decrease in the Contract Price <br /> resulting from such changes shall be adjusted in the manner provided herein for adjustments <br /> as to extra and/or additional Work and changes. However, neither the Owner nor the Designer <br /> shall be liable or responsible for additional work, costs, or changes to the Work that could <br /> have been reasonably determined from any reports, surveys, and analyses made available for <br /> the Contractor's review or that could have been discovered by the Contractor through the <br /> performance of its obligations pursuant to the Contract Documents. <br /> ARTICLE 15. CORRECTION OF WORK BEFORE FINAL PAYMENT <br /> 15.1 The Owner has the authority to stop or suspend work, and the Designer has the authority to <br /> order Work removed or to order corrections of defective Work or Work not in compliance with <br /> the Contract Documents where such action may be necessary to ensure successful completion of <br /> the Work. <br /> Any work, materials, fabricated items, or other parts of the Work which have been found by the <br /> Designer to be defective or not in accordance with the Contract Documents shall be condemned <br /> and shall be removed from the Project by the Contractor, and immediately replaced by new <br /> Work in accordance with the Contract Documents at no additional cost to the Owner. Work or <br /> property of the Owner or others damaged or destroyed by virtue of such condemned Work shall <br /> be made good at the expense of the Contractor. <br /> Correction of condemned Work described above shall be commenced by the Contractor within <br /> twenty-four(24) hours after receipt of notice from the Designer and shall make satisfactory <br /> progress, as determined by the Designer, until completed. Should contractor fail to proceed <br /> with required corrections, the owner may complete the work in accordance with Article 17. <br /> Condemned Work removed shall be the property of the Contractor and shall be removed from <br /> the Project by him within ten (10) days after notice to remove it, and if not then removed, <br /> thereafter may be disposed of by the Owner without compensation to the Contractor and the cost <br /> of such disposal shall be deducted from amounts due or to become due to the Contractor. <br /> Contractor Initi Owner Initial /1?)7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.