My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-2020 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2020
>
12-21-2020 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:31:47 AM
Creation date
2/22/2021 11:31:44 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
12/21/2020
Book No
32
Page No
325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.14 The Contractor shall give all notices and comply with all laws, ordinances, rules, and <br /> regulations applicable to the Work and shall protect and indemnify the Owner and the Owner's <br /> officers, agents, or servants against any claim or liability arising from or based on the violation <br /> of any such law, ordinance, regulation, order, or decree, whether by the Contractor or by the <br /> Contractor's employees, Subcontractors, sub-subcontractors <br /> 7.15 The Contractor shall be responsible for the entire site of the Project and for its reasonable <br /> and necessary protection and security, as required by laws or ordinances governing such <br /> conditions, or by custom or sound construction practices, and shall share such responsibilities as <br /> may be agreed upon among them, or in the absence of such agreement, as may be directed by the <br /> Contract Documents, Owner, or Designer. The Contractor shall be responsible for any damage to <br /> the Owner's property, or that of others, by the Contractor or the Contractor's employees, <br /> Subcontractors, sub-subcontractors, or their employees or agents, and shall make good such <br /> damages. The Contractor shall be responsible for and pay for any such claims against the Owner. <br /> 7.16 The Contractor shall protect all landscaping designated to remain in the vicinity of the <br /> operations and barricade all walks, roads, and areas as necessary to keep the public away from <br /> the construction. <br /> 7.17 The Contractor shall provide cover and/or protect all portions of the Work and provide all <br /> materials necessary to protect the Work whether performed by the Contractor or any of the <br /> Subcontractors or sub-subcontractors. Any Work damaged through the lack of proper protection, <br /> or from any other cause, shall be repaired or replaced without extra cost to the Owner or <br /> extension to the Contract Time. <br /> The Contractor shall maintain the Work during construction and until the Work is accepted. <br /> This maintenance shall constitute continuous and effective effort prosecuted day by day,with <br /> adequate equipment and forces so that the Work is maintained in satisfactory condition at all <br /> times. All costs of maintenance shall be included in the Contract Price and the Contractor will <br /> not be paid an additional amount for such effort. Should the Owner or Designer observe that <br /> the Contractor at any time has failed to maintain the Work as provided herein, the Designer <br /> may immediately notify the Contractor of such noncompliance. Such notification shall specify <br /> a reasonable time within which the Contractor shall be required to remedy such unsatisfactory <br /> maintenance condition. Should the Contractor fail to properly respond to the Designer's <br /> notification, the Owner may, at the Contractor's expense, take such action as it may deem <br /> appropriate to remedy the defective maintenance, including suspension of the Contractor's <br /> Work or any part thereof. Any such expense incurred by the Owner shall be deducted from <br /> monies due or to become due the Contractor. <br /> Parking lots, streets, and walks connecting to the Project area shall be protected by the <br /> Contractor from deposits of mud, sand, stone, litter, or debris in any form. <br /> Pedestrian traffic areas around the construction limits must be maintained in a clean and safe <br /> condition at all times with required barricades and covered walkways. When excavation or <br /> other operations outside the Project limits is required, the Contractor shall, immediately <br /> following that work, return the area to its original condition. <br /> Contractor Initiā¢ Owner Initial /Or- <br />
The URL can be used to link to this page
Your browser does not support the video tag.