My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-2020 BOC Regular Meeting
public access
>
Clerk
>
MINUTES
>
2020
>
12-21-2020 BOC Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 11:31:47 AM
Creation date
2/22/2021 11:31:44 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
12/21/2020
Book No
32
Page No
325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the reasons for desiring to make the change. If approval is given, it shall be on the condition <br /> that the Contractor shall be fully responsible for producing Work in conformity with the <br /> requirements of the Contract Documents. If, after trial use of the substituted methods or <br /> equipment, the Designer determines that the Work produced does not meet the requirements of <br /> the Contract Documents, the Contractor shall discontinue the use of the substitute method or <br /> equipment and shall complete the remaining Work with the specified methods and equipment <br /> at no additional cost to the Owner. The Contractor shall remove any deficient Work and <br /> replace it with Work of specified quality, or take such other corrective action as the Designer <br /> may direct. No change in the Contract Price or in Contract Time shall be made as a result of <br /> authorizing a change in methods or equipment under this paragraph. <br /> 7.6 All materials and equipment shall be new, except as otherwise provided in the Contract <br /> Documents. When special makes or grades of material which are normally packaged by the <br /> supplier or manufacturer are specified or approved, such materials shall be delivered to the <br /> Project site in their original packages or containers with seals unbroken and labels intact. <br /> Materials shall be so stored as to assure the preservation of their quantity, quality and fitness for <br /> the Work. Stored materials, even though approved before storage, may again be inspected by the <br /> Designer or Owner prior to their use in the Work and shall meet the requirements of the <br /> Contract Documents at the time they are incorporated into the Work. Stored materials shall be <br /> located so as to facilitate their prompt inspection. The Contractor shall coordinate the storage of <br /> all materials with the Designer and the Owner. Materials to be stored at the Project or on the <br /> Owner's property shall not create an obstruction to the Owner's or other contractor's reasonable <br /> activities. Private property shall not be used for storage purposes without written permission of <br /> the owner or lessee of such property. The Contractor shall make all arrangements and bear all <br /> expenses for the storage of materials on private property. Upon request, the Contractor shall <br /> furnish the Owner a copy of the property owner's permission. All storage sites on private or the <br /> Owner's property shall be restored to their original condition by the Contractor at his entire <br /> expense, except as otherwise agreed to (in writing) by the owner or lessee of the property. <br /> 7.7 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and <br /> conditioned in accordance with the instructions of the applicable manufacturer, fabricator, or <br /> processor, except as otherwise provided in the Contract Documents. <br /> 7.8 The Contractor will be fully responsible for all acts and omissions of his Subcontractors and <br /> of persons directly or indirectly employed by them and of persons for whose acts any of them <br /> may be liable to the same extent that the Contractor is responsible for the acts and omissions of <br /> the Contractor's own employees.Nothing in the Contract Documents shall create any <br /> contractual relationship between any Subcontractor or supplier and the Owner or the Designer, <br /> or any obligation on the part of the Owner or the Designer to pay or see to the payment of any <br /> money due any such Subcontractor or material furnisher except as may otherwise be required by <br /> law. The Owner or the Designer may furnish to any Subcontractor or supplier, to the extent <br /> practicable, evidence of amounts paid to the Contractor on account of specific Work done. <br /> 7.9 The divisions and sections of the Specifications and the identifications of any Drawings shall <br /> not control the Contractor in dividing the Work among Subcontractors. <br /> Contractor Initial/ Owner Initial <br />
The URL can be used to link to this page
Your browser does not support the video tag.