Laserfiche WebLink
r�: <br />UTILITIES <br />5. The County and /or Fire Department, without any cost or liability whatsoever to the Department, <br />shall relocate and adjust all utilities in conflict with the Project. All utility work shall be performed <br />in a manner satisfactory to and in conformance with rules and regulations of the Department <br />prior to the County and /or Fire Department beginning construction of the Project. The County <br />and /or Fire Department shall make all necessary adjustments to house or lot connections or <br />services lying within the right of way or construction limits of the Project, whichever is greater, <br />regardless of ownership of the connections or services. Any encroachment agreement and <br />permits required for the Project must be obtained from the Division Office. All work shall be <br />performed in accordance with the Department's approved Utility Relocation Policy and standard <br />procedures for utility improvements. <br />RIGHT OF WAY <br />6. The County and /or Fire Department, at no expense or liability whatsoever to the Department, <br />shall be responsible for acquiring any needed right of way and permanent easements required <br />for said Project. If the Project is not to be constructed within the existing right of way, the County <br />and /or Fire Department will be responsible for any additional right of way or easements. <br />Acquisition of right of way shall be accomplished in accordance with applicable policies, <br />guidelines, statutes and the North Carolina Department of Transportation Right of Way Manual. <br />The County and /or Fire Department shall remove from said right of way all obstructions and <br />encroachments of any kind or character (including hazardous and contaminated materials). The <br />County and /or Fire Department shall indemnify and save harmless the Department from any and <br />all claims for damages that might arise on account of said right of way acquisition, and <br />construction easements for the construction of said Project. <br />CONSTRUCTION <br />7. The County and /or Fire Department shall construct, or cause to be constructed, the Project in <br />accordance with the plans and specifications of said Project as filed with, and approved by, the <br />Department. The County and /or Fire Department shall enter into and shall administer the <br />construction contract for said Project and the procedures set out herein below shall be followed: <br />Agreement ID # 2904 <br />