My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - April 2, 2012 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2012
>
Minutes - April 2, 2012 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 2:54:41 PM
Creation date
4/19/2012 2:53:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK:00024 PG:0840 <br />§ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated <br />below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br />(Insert rate of interest agreed upon, if any.) <br />% <br />§ 8.3 The Owner's representative: <br />(Name, address and other information) <br />Marc Clark, Proiect Manager <br />Lee County, North Carolina <br />106 Hillcrest Drive <br />Sanford, North Carolina 27331 <br />Telephone: (919) 7184605 <br />§ 8.4 The Contractor's representative: <br />(Name, address and other information) <br />Ed Dreyer, Vice President <br />Racanelh Construction South, Incorporated <br />403 Troycott Place <br />Cary, North Carolina 27519 <br />Telephone(919)535 -8715 <br />§ 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the <br />other party. <br />§ 8.6 Other provisions: <br />None <br />ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS <br />§ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in <br />the sections below. <br />§ 9.1.1 The Agreement is this executed AIA Document A 101 -2007, Standard Form of Agreement Between Owner <br />and Contractor. <br />§ 9.1.2 The General Conditions are AIA Document A201 -2007, General Conditions of the Contract for Construction. <br />§ 9.1.3 The Supplementary and other Conditions of the Ca:. ;aetiContract are those contained in the Protect Manual <br />dated January 18, 2012 and are as follows: <br />DasumenE Tide <br />Date Rages <br />Document Title <br />Paaes <br />000100 Invitation to Bid <br />1 <br />AIA Document A201 General Conditions of <br />45 <br />the Contract for <br />Construction <br />§ 9.1.4 The °— '=,aasSpecifications are those contained in the Proiect Manual dated as in Section 9.1.3, and are <br />as follows: <br />(Either list the Specifications here or refer to an evhibit attached to this Agreement.) <br />DNISION 01 GENERAL REQUIREMENTS <br />AIA Document A101 — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American <br />Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized <br />reproduction or distribution oft his AIA' Document, or any port ion of it, may result in severe civil and criminal penalties, and will be prosecuted to the <br />t maximum extent possible under the law. This document was produced by AlA software at 13:18:11 on 03/22/2012 under Order No.8006592437_1 which expires <br />on 04/21/2012, and is not for resale. <br />User Notes: (1517705818) <br />
The URL can be used to link to this page
Your browser does not support the video tag.