My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Package - 2-20-12 Reg. Meeting
public access
>
Clerk
>
AGENDA PACKAGES
>
2012
>
Agenda Package - 2-20-12 Reg. Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 7:57:57 AM
Creation date
2/15/2012 7:54:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
076 <br />(11) Furnish copies of the Bidding Documents as requested by the Contractors, material suppliers, <br />and other interested parties for bidding. <br />(12) Prepare, as may be required, written Addenda amending the Bidding Documents. <br />Assist the Owner in the receiving of bids, tabulate same for ready comparison, and advise the <br />Owner to the best of our ability as to proper and judicious award of contracts. <br />I.B. CONSTRUCTION CONTRACT ADMINISTRATION <br />(1) Assist the Owner in the advertising for bids. <br />(2) Furnish copies of the Bidding Documents as requested by the Contractors, material suppliers, <br />and other interested parties for bidding. <br />(3) Prepare, as may be required, written Addenda amending the Bidding Documents. <br />(4) Assist the Owner in the receiving of bids, tabulate same for ready comparison, and advise the <br />Owner to the best of our ability as to proper and judicious award of contracts. <br />(5) After award of contract(s), the Engineer will prepare the Contract Documents for execution by <br />the Contractor(s) and the Owner. <br />(6) Prior to the start of construction, the Engineer will assist the Owner in preparing an agenda and <br />conducting a preconstruction conference. <br />(7) Review and approve, for conformance with the design concept, any necessary shop and <br />working drawings furnished by contractors. Furnish the Owner with a complete set of shop <br />drawings upon completion of construction. <br />(8) Interpret the intent of the drawings and specifications to protect the Owner against defects and <br />deficiencies in construction on the part of the contractors. The Engineer will not, however, <br />guarantee the performance by any contractor. <br />Page 3 of 6 Pagea <br />APPENDIX 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.