My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983 - 06-06-83 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1983
>
1983 - 06-06-83 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2009 11:36:23 AM
Creation date
4/27/2009 11:35:03 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />3OOK <br />COUNTY OF LEE, <br />7 <br />A 1„ ~.5a <br />NORTH CAROLINA <br />SPECIAL ASSESSMENTS FOR WATER EXTENSIONS <br />GRANT OF AUTHORITY AND PROCEDURES <br />G.S. 153A-185 through 153A-204 provides municipalities authority <br />to extend waterlines and to defray the cost of waterlines by <br />special assessments upon the property. The bases for Lee County <br />making assessments under G.S. 153A-186 is the accepted <br />agreement of 51% or more of a combination of: <br />1. Front footage abutting on the project, at an equal <br />rate per foot of frontage; and <br />2. The area of land served, or subject to being served, <br />by the project, at an equal rate per unit of area. <br />In circumstances where a community or a group of water users is <br />located some-distance from the point of existing waterline and <br />requests water services under this policy, then it would be the <br />responsibility of the community or requesting group to make funds <br />available to cover the cost of installing the waterline in~the space <br />between the community and connecting to the existing waterline. <br />During a ten-year period following the installation of the waterline <br />between the community and the connecting point of the waterline <br />system, connection fees (according to front footage and acreage <br />requirements) will be charged and the funds turned over to the <br />® community or the group who originally funded the cost for the area <br />in which the waterline was installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.