Laserfiche WebLink
v <br />LI <br />ooR i1 283 <br />REVISED ELECTRICAL PERMIT FEES <br />Minimum Charge <br />Single Phase: <br />60 Amp <br />100 Amp <br />150 Amp <br />200 Amp <br />Plus: <br />Additional 200 over 200 Amp <br />Special Circuits or Motors <br />Subpanels <br />$10.00 <br />10.00 <br />16.00 <br />20.00 <br />20.00 <br />+ 10.00 <br />2.00 Each <br />3.00 Each <br />3-Phase: <br />® Minimum Charge 20.00 <br />Plus: <br />Per 200 Amps over 200 Amps 10.00 <br />Temporary Service Pole 10.00 <br />(Without a Building Permit) <br />Mobile Home Set-up 10.00 <br />Central Air Conditioning or Heat Pump 10.00 <br />(Plus Electrical Permits as per amperage) <br />Note: There will be a $10.00 additional. charge per trip for all <br />over two (2) inspection trips due to code violations. <br />0 <br />