Laserfiche WebLink
• aoOK it r:'.s. 281 I <br />FEE RECOMMENDATIONS <br />BUILDING <br />Structure with market value of: <br />$ 100 to 5,000 <br />5,001 to 10,000 <br />10,001 to 25,000 <br />25,001 to 50,000 <br />50,001 to 100,000.. <br />Each-Additional $1,000........ <br />All Special Permits...... <br />$10.00 <br />20.00 <br />50.00 <br />100.00 <br />200.00 <br />2.00 Per $1,000 <br />10.00 <br />Note: Market value for dwellings to be estimated on current <br />market value. <br />E1.FCTRTCAI. <br />Minimum Charge 10.00 <br />All Single Phase: <br />® 100 Amp 16.00 <br />200 Amp 20.00 <br />Additional 200 over 200 Amps... 10.00 <br />Special Circuits 2.00 Each <br />Subpanels 3.00 Each <br />All 3 - Phase: <br />Minimum 20.00 <br />120/208 10.00 Additional 200 Amps <br />120/230 10.00 Additional 200 Amps <br />120/230/460 20.00 Additional 200 Amps <br />PLIIMRT NG <br />Minimum Charge 10.00 <br />Plus Each Fixture 2.00 <br />MECHANICAL <br />Minimum Fee <br />10.00 <br />Plus Heat Pump <br />10.00 <br />Up <br />to 10 ton <br />Over 10 ton <br />3.00 <br />Per <br />ton <br />Air Conditioning Units......... <br />10.00 <br />Up <br />to 10 ton <br />Over 10 ton <br />3.00 <br />Per <br />ton <br />Heating Units <br />10.00 <br />• 100% Penalty for construction started before permit requests. <br />$10.00 Fee for second inspection trips due to code violations. <br />