Laserfiche WebLink
• <br /> In the event that an application for a Special Use Permit is denied by the Board of <br /> Adjustment,the Board of Adjustment shall refuse to accept another application for the same <br /> amendment on the same property or any portion of the same property within one (1) year of <br /> the original hearing. However, the Board of Adjustment may consider such application <br /> within that time if relevant evidence that was not reasonably available at the time of the <br /> original hearing is presented. <br /> Section 7. That Article 13 —Flood Hazard Area Regulations, Section 13.8 Provisions for <br /> Flood Hazard Reduction, Subsection 13.8.1.10 as follows: <br /> 13.8.1.10 New solid waste disposal facilities and sites, hazardous waste management <br /> facilities, salvage yards, chemical storage facilities, oil and gas exploration, development <br /> and/or production operations, and mining and quarrying operations shall not be permitted, <br /> except by variance as specified in Section 13.7.10. A structure or tank for chemical or fuel <br /> storage incidental to an allowed use or to the operation of a water treatment plant or <br /> wastewater treatment facility may be located in a Special Flood Hazard Area only if the <br /> structure or tank is either elevated or floodproofed to at least the regulatory flood protection <br /> elevation and certified according to Section 13.4.4 of this ordinance. <br /> Section 8. This ordinance shall be in full force and effect from and after the date of its <br /> adoption. <br /> ADOPTED this the 3rd day of June 2019. <br /> 4 <br /> d1l01.47,62L-- <br /> Amy Da rymple, Chairman <br /> Lee County Board of Commissioners <br /> ATTEST: s, f'` tit <br /> (14 .^ rj <br /> • G � , <br /> Whitney Parris , Deputy Clerk to the Board ��. �``� F'•' :"' <br /> APPROVED AS TO FORM: <br /> Whitney Parrish, ee ounty Attorney <br /> 12 <br />