Laserfiche WebLink
CHANGE <br />ORDER <br />ACKEN & ASSOCIATES, A. <br />- 8011-IAWKINSAVE. <br />SANFORD, N. C. 27330 <br />TELEPHONE (919) 776-5622 <br />pq <br />p90 r';GE 931. <br />I7 OWNER CT <br />CONTRACTOR <br />FIELD <br />OTHER <br />- l <br />L,V <br />4f`Jt <br />PROJECT: Lower <br />Moncure and Riddle Road Waterline <br />TO F- Lee County Water Department PROJECT NO: E-21085 <br />PO Box 987 CONTRACT FOR: BItie Construction <br />Sanford, N.C. 27330 <br />L J CONTRACT DATE: 11-4-85 <br />You are directed to make the folicwing changes in this Contract: <br />Item 10 (3/4" Meter Box & Lateral) original. cost $6,000.00 <br />Delete one (1) service. Total. cost now $5,800.00. <br />Item 19 (Rock Excavation) original cost $0.00. Additional <br />cost $2,000.00. <br />Item 20 (1" Meter Box & Lateral) original cost $0.00. <br />Additional cost $250.00. <br />• <br />Original Contract Sum was $110,158.00 <br />Net change by previous Change Orders $ 1,500.00 <br />Contract Sum prior to this Change Order was $111,658.00 <br />Contract Sum will be (increased) (ffe`6Ke)fiKevd) (hr)Hili`jgfh by this Change Order $2050.00 <br />New Contract Sum included this Change Order wilt be $ 113, 708.00 <br />Contract Time will be (increased) (decreased) (unchanged) by ( ) 0 Days. <br />Date of Completion as of the date of this Change Order therefore is <br />Bracken and Associates Blue Construction Lee County Water Dept. <br />PO Box .532 CONTRACTOR PO Box 1090 OYYNERPO BOX 987 <br />Address Address <br />Sanford. NC 27330 SanforS] NC 27330 Ssn[nrrl till _2?3;1-0- <br />SM 1 - <br />e BY ,t~: By By <br />DATEMarch 6.1986 DATE= March 6 1986 DATEMarrh r, Lr186 <br />DATE OF ISSUANCE March 6, 1986 CHANGE ORDER NUMBER two <br />