Laserfiche WebLink
LEE COUNTY SCHOOLS SQUARE FOOTAGE /CAPACITY/MOBILES - OCTOBER 25, 2011 10 8 <br />SCHOOL <br />SQUARE <br />SITE <br />BUILDINGS <br />POF <br />STUDENT <br />CURRENT <br />YEAR <br />FEET <br />ACREAGE <br />CLASSROOMS <br />CA PAC I'I'}' <br />ENROLLMENT <br />BUILT <br />BRAGG STREET <br />10,893 <br />17-36 <br />3 Buildings <br />5 <br />62 <br />56 <br />1950 <br />4,320 - M <br />+ 5 Mobiles <br />BROADWAY ELEM. <br />86,615 <br />9.21 <br />2Buildings <br />29 <br />638 <br />554 <br />1998 <br />(NEW +OLD GYM) <br />1,728 - M <br />+2 Mobiles <br />1954 GYM <br />B. T. BULLOCK <br />78,768 <br />60.51 <br />1 Building <br />27 <br />594 <br />647 <br />1998 <br />2,592 - M <br />+3 Mobiles <br />DEEP RIVER ELEM. <br />78,768 <br />63.05 <br />1 Building <br />27 <br />594 <br />654 <br />1998 <br />3,456 - M <br />+ 4 Mobiles <br />EAST LEE MIDDLE <br />95,983 <br />36.94 <br />2 Buildings <br />40 <br />880 <br />690 <br />1978 <br />1995 - Addition <br />EDWARDS ELEMENTARY <br />70,229 <br />30.9 <br />1 Building <br />31 <br />682 <br />707 <br />1987 <br />3,456 -M <br />+4 Mobiles <br />FLOYD L. KNIGHT <br />20,841 <br />1141 <br />4 Buildings <br />9 <br />110 <br />66 <br />1955 -1981 <br />GYM /THERAPY ADD. <br />12,232 <br />+3 Mobiles <br />3 <br />2008 - Addition <br />2,592 - M <br />HEINS EDUCATION BLDG. <br />22,344 <br />2.755 <br />1 Building <br />1978 <br />GREENWOOD ELEM. <br />94,324 <br />29.7 <br />3 Buildings <br />30 <br />660 <br />659 <br />1989 <br />1728 -M <br />+2 Mobiles <br />INGRAM ELEMENTARY <br />70,229 <br />43.7 <br />1 Building <br />31 <br />682 <br />702 <br />1987 <br />4,320 - M <br />+ 5 Mobiles <br />JONESBORO <br />44,331 <br />26.4 <br />613uddings <br />1951 <br />LEE COUNTY HIGH <br />332,989 <br />70.4 <br />16 Buildings <br />52 (97) ** <br />1675 <br />1403 <br />1951 -2011 <br />Mobiles <br />1,728 -M <br />+2Mobiles <br />2 <br />(1840) ** <br />PODS <br />24,048 - P <br />2 - Pods <br />26 <br />LEE EARLY COLLEGE <br />292 <br />MAINTENANCE FACILITY <br />19,400 <br />INC. LCHS <br />5 Buildings <br />1973 <br />SANLEE MIDDLE <br />137,396 <br />INC. INS LHS <br />1 Building <br />38 <br />836 <br />817 <br />2007 <br />SOUTHERN LEE HIGH <br />183,520 <br />85.6 <br />3 Buildings <br />55 <br />1375 <br />1079 <br />2005 <br />ESL HOUSE <br />1,080 <br />INC. IN LCHS <br />1 Building <br />1975 <br />TRAMWAY ELEM. <br />7 &768 <br />34.20 <br />1 Building <br />27 <br />594 <br />701 <br />1998 <br />1,728 -M <br />+2 Mobiles <br />*" *WARREN WILLIAMS <br />19,401 <br />13.1 <br />2 Buildings <br />12 <br />120Students <br />108 Pre -K Students <br />1950 -Upper <br />ELEM. ALT. SCH. <br />2,592 - M <br />+3 - Mobiles <br />30 Adults <br />18 Adults <br />1953 - Lower <br />8 Elem students <br />WEST LEE MIDDLE <br />95,983 <br />45.95 <br />2 Buildings <br />40 <br />880 <br />731 <br />1978 <br />1995- Addition <br />BUS GARAGE <br />7,962 <br />INC. IN <br />2 Buildings <br />1973 <br />JONESBORO <br />'I OTALS <br />1,562,056 <br />58 Buildings <br />30,240 -M <br />+35 Mobiles <br />24,048 *P <br />+ 2 Pods <br />GRAND TOTALS <br />1.616344 <br />582.185 <br />95 <br />484 <br />10.382 <br />9766 <br />(529) *" <br />(111,547)" <br />M *= Mobile Unit Square Footage/ P =Pods <br />* *Figure based on completion of LCHS Renovation <br />-"Warren Williams Child Dev. Center - Student figures are not included in totals or Grand Totals <br />Secondary Student Capacity is based upon 25 students per classroom and Core Curriculum Courses (Language Arts, Mathematics, Science and Social Studies) <br />K -8 capacity based on 22 smdents/class; and 25 students grades 9 -12 <br />Capacity figures do not include the need for reduced class size for Exceptional Children. <br />April 25, 2007 -Dr. Jim Atkinson / June 2007 -Added mobile units ING (1) / DRS (2) <br />June 2008- Added SanLee Middle /FLK - Therapy Addition /Returned ELM/ WLM Mobile Units /Relocated 10 Mobile Units to l - BSA, I- ING, 2- T'WAY. 6 -LCFIS <br />Oct. 2008 - Added mobile units I- Edwards / 1- Greenwood <br />Febmarv2009 -Add2- PODS -LCHS <br />6/10 1 Mobile LCHS - Destroyed- 5 Moved - EDWS (1) GWD (1) WWS (3) - Added new Maintenance Storage Bldg. - I -New Mobile BTB <br />10/18/11 -Added LCHS -New Bldg. <br />Current Enrollment based on 9/22/11 (Month 1 Student totals for LCS) <br />Revised: 10/21 /11 <br />