My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-18 Regular Meeting
public access
>
Clerk
>
MINUTES
>
2018
>
12-17-18 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:50:53 AM
Creation date
2/15/2019 9:50:12 AM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
Date
12/17/2018
Book No
30
Page No
111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1% WithersRavenel <br /> Our People.Your Success. <br /> As previously proposed by WithersRavenel,it is anticipated that the design portion of the project may take up to <br /> twenty-six(26)weeks from the Notice to Proceed.The time required to complete the design services listed in <br /> Section B(as well as Section C-Additional Services)will be extended by negotiation in the event WithersRavenel <br /> is delayed by circumstances as listed in the above. Further,the total construction timeframe for the project is <br /> estimated at 9 months from award of construction contract by the County. However,this could change based on <br /> the contractor's progress and if the lowest responsible bidder had an excessive amount of RFI's and/or <br /> subcontractors and typically would be anticipated for this type of work. <br /> I. Acceptance <br /> Receipt of an executed copy of this agreement will serve as the written agreement between WithersRavenel and <br /> Lee County for the basic services outlined in Section B of this document.The terms outlined in the attached <br /> Exhibits-Standard Terms and Conditions(Exhibit IX),Fee&Expense Schedule(Exhibit X),and Site Exhibits shall <br /> be considered a part of this agreement. <br /> OFFERED BY: ACCEPTED BY: <br /> WITH , ' •VENEL LEE COUNTY <br /> ,/ 12J414041-47>ifie—Pt61/.70)-2 <br /> Ga Warner Date Amy Dalrymple Da <br /> Project Manager Chair,Lee County Commission <br /> �/'• 12-4-18 <br /> rock Storrusten Date <br /> Vice President <br /> Attachments <br /> Exhibit I-IV:Site Improvement Exhibits <br /> Exhibits V-VIII:Survey and Subsurface Exhibits <br /> Exhibit IX:Standard Terms and Conditions <br /> Exhibit X:Fee&Expense Schedule <br /> Lee County Park Design WR No.02181091.00 <br /> 12.04.18 Page 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.