Laserfiche WebLink
1% WithersRavenel <br /> Our People.Your Success. <br /> ► Locate subsurface wet and dry utilities within the survey limits within the rights-of-way of the <br /> perimeter roads based on the field observation of visible aboveground structures and the location of <br /> SUE Quality Level B paint markings to be provided by us.The location of sub-surface utilities is <br /> approximate. Other sub-surface utilities may exist on site that are not included in the survey. <br /> WithersRavenel or their representatives will not investigate or locate utilities which are not evident <br /> from aboveground; <br /> ► Locate individual trees>1-8'DBH in open areas. Locate trees lines. Does not include the location of <br /> individual trees within wooded areas. <br /> ► Contours to be mapped to a 1'(one-foot)contour interval; <br /> ► Mapping to be prepared at a scale suitable for use as a civil design base map; <br /> ► Project to be delivered as a signed PDF file and as a Civil3D.dwg file; <br /> ► Boundary survey will not be prepared as a recordable plat. <br /> Temple Park <br /> ► Boundary survey of approximately 4.5 acres as highlighted in red on Exhibit VI,attached. Topographic <br /> survey limits of approximately 5.6 acres as highlighted in yellow on Exhibit VI,attached. Survey limits <br /> extend to the center of the perimeter roadways; <br /> ► Survey to be prepared to the same specifications as outlined in Horton Park,above. <br /> j(iwanis Children's Park <br /> ► Boundary survey of approximately 4.5 acres as highlighted in red on Exhibit VII,attached. Topographic <br /> survey limits of approximately 6.1 acres as highlighted in yellow on Exhibit VII,attached. Survey limits <br /> extend to the center of the perimeter roadways; <br /> ► Survey to be prepared to the same specifications as outlined in Horton Park,above. <br /> O.T.Sloan Park <br /> ► Boundary survey of approximately 42.3 acres as highlighted in red on Exhibit VIII,attached. <br /> Topographic survey limits of approximately 9.8 acres as highlighted in yellow on Exhibit VIII,attached. <br /> Survey limits extend to the center of the perimeter roadways; <br /> ► Survey to be prepared to the same specifications as outlined in Horton Park,above. <br /> TASK 4-OPINION OF PROBABLE CONSTRUCTION COSTS <br /> Throughout the development of the design for the project,WithersRavenel shall prepare an Opinion of Probable <br /> Construction Costs.The anticipated costs will be based on the design,WithersRavenel's past project experience <br /> and industry standards. The Opinion of Probable Construction Costs will be used to assist the County and <br /> WithersRavenel in discussions of possibly phasing proposed improvements.Revisions to the Opinion of Probable <br /> Costs will be made at each submittal with adjusted quantities,items,and associated costs,starting with the Final <br /> Master Plan,as detailed herein. <br /> Deliverables(paper and.pdf formats): <br /> ► Opinion of costs will be provided at submittal intervals,as detailed herein <br /> TASK 5-PRELIMINARY/SCHEMATIC DESIGN(30%PLANS) <br /> 5.1 Schematic Plans <br /> Based on the Final Master Plans and the Phase 1 Plans,WithersRavenel shall prepare a schematic design package, <br /> including plantings,paving,and site furnishings for the following elements of the project: <br /> • Pedestrian access,walkways and plazas <br /> • Plantings areas including buffer areas and accent areas <br /> Lee County Park Design WR No.02181091.00 <br /> 12.04.18 Page 4 of 12 <br />