My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 - 01-09-89 Regular Meeting
public access
>
Clerk
>
MINUTES
>
1989
>
1989 - 01-09-89 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2009 3:25:19 PM
Creation date
4/16/2009 3:24:49 PM
Metadata
Fields
Template:
Admin-Clerk
Document Type
Minutes
Committee
Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK; 12 ?AGE 604 <br />3/24/88 FBA completed preliminary negotiations of property for river <br />intake and lines. Final easement letters sent to property <br />owners and final negotiations started. <br />3/25/88 FBA received WTP soil boring reports. FBA requested pumping <br />equipment proposal from suppliers. <br />4/1/88 FBA received chemical feed equipment proposals. <br />4/7/88 County had soil borings of water tank site performed. <br />4/7/88 FBA received mixing and chlorinator equipment proposals. <br />4/14/88 FBA received soil boring report for water tank. <br />4/18/88 FBA received pumping equipment proposals. <br />4/28/88 FBA sent offer to purchase easements for river intake and <br />line to property owner, negotiations continued. <br />5/5/88 FBA purchased chemical feeders and mixers. <br />5/12/88 FBA purchased motor control center and generator <br />5/16/88 County sent Golden Poultry deed of WTP site for their ap- <br />proval. <br />5/17/88 FBA purchased clarifiers, filters and chlorination equip- <br />ment. <br />5/19/88 County took bids on water tank. FBA purchased pumping <br />equipment. <br />5/23/88 FBA issued bid tabulation of water tank to County. <br />5/24/88 FBA held prebi.d conference for WTP. <br />6/2/88 FBA issued letter to County requesting they acquire ease- <br />ments for river intake and lines. <br />6/3/88 County awarded water tank construction contract and issued <br />contractor notice to proceed. FBA received water tank shop <br />drawings from contractor. <br />6/7/88 FBA received foundation design drawings from contractor for <br />water tank. FBA issued contracts to contractors on behalf <br />of county for water tank. <br />6/10/88 FBA received bids from contractors for water treatment <br />plant. <br />6/14/88 FBA transmitted water tank shop drawings to contractor, copy <br />sent to Lee County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.